3
ALIZÉ COOLING UNIT
To optimize your HVAC experience, Dettson offers the Al-
izé cooling system.
3.1
THERMOSTAT USING ALIZÉ
SYSTEM
When using the Alizé cooling unit, the communicating
thermostat must be used (R02P032). The interface card
(K03081) will be able to gather information from the out-
door unit, the furnace and the thermostat, making this in-
tegrated system easy to install. The indoor blower speed
will be determined by various factors including outdoor
temperature, compressor speed and demand from the
thermostat. The balance point (temperature at which the
unit will switch from heat pump heating to auxiliary heat,
in this case gas) will be adjustable through the thermo-
stat. If this unit is destined to be used as a cooling system
only, the heat pump can also be disable from the commu-
nicating thermostat, by using emergency heat. For more
details refer to the manual provided with the thermostat.
3.2
POSITION OF THE INTERFACE
BOARD
Provision has been made on the main control board sup-
port in the furnace to locate the interface board (K03069).
Refer to figure 1.
3.3
WIRES CONNECTIONS WITH
THE INTERFACE BOARD
Figure 2, explains how to properly wire the interface
board to the ERV/HRV and main furnace control. For
the complete wire connection, please refer to the Alizé
manual. The interface board allows the ERV/HRV to be
interlocked with the furnace, giving a smooth and quiet
operation of the whole system.
Figure 1 – Interface card position
4
INSTALLATION
The furnace is factory built for upflow position. In this po-
sition, the drain trap can be installed on right or left side
depending on air return duct. When installing the furnace
in the upflow position, make sure it is leveled.
To ensure proper drainage of the condensate when
installed in position other than upflow, tilt the furnace
from level position to a minimum slope of ½” higher
at back to front.
When installing the furnace in other orientation than the
upflow position, simply configure the condensate tubing
accordingly with the instructions provided in this section
of the manual.
13
Содержание Chinook C105-M-V
Страница 24: ...Figure 10 Typical gas pipe arrangement 23...
Страница 27: ...Figure 11 Wiring Diagram 26...
Страница 39: ...Figure 14 Wiring Diagram Modulating t stat 38...
Страница 53: ...Table 17 CFM 52...
Страница 54: ...Figure 15 Dimensional Drawing 53...
Страница 55: ...14 PART LIST 54...
Страница 56: ...Figure 16 Exploded view 1 55...
Страница 57: ...Figure 17 Exploded view 2 56...
Страница 59: ...Table 19 Parts list continued 58...
Страница 60: ...Table 20 Parts list MS 59...
Страница 61: ...Table 21 Parts list MS continued 60...