AC CRUISE-100 v2.4 (04/2021)
Page 9
3) Motor/Pump Block
Ø
To ensure optimal production, the assembly of the high-pressure motor block must be
completed as low as possible in the boat, in a horizontal position and in an area
protected from water sprays.
Ø
Use the 2 stainless steel legs under the 2 motors to fix the motor block. Leave a
few centimetres of wiggle room around it.
Ø
Provide sufficient airflow for the ventilation of the motors.
Ø
The connection of the prefilter outlet to the inlet of the pump on the suction-side
pump should be done using Tricoflex piping Ø 12mm (inside diameter) and 2
stainless steel collars at each connection.
Ø
The connection of the pump's high-pressure head to the membrane inlet (red mark)
should be done using a high-pressure hose that is cut to size (follow closely the
assembly instructions in
Appendix A2
).
Ø
Put a little liquid Loctite or threadlock on the male and female cones before each
connection.
: Stainless steel legs for fixing the motor/pump block
and : Connect the prefilter outlet to the pump intake
: Tricoflex piping
Ø
12mm (inside diameter) for the water system
Содержание AC CRUISE D100
Страница 27: ...AC CRUISE 100 v2 4 04 2021 Page 27 Appendix A5 Troubleshooting...
Страница 28: ...AC CRUISE 100 v2 4 04 2021 Page 28 Appendix A6 Guide of the Indicator Lights of the Mini Remote Control...
Страница 29: ...AC CRUISE 100 v2 4 04 2021 Page 29 Appendix A7 Circuit diagram of the electronic board...
Страница 30: ...AC CRUISE 100 v2 4 04 2021 Page 30 Appendix A8 Schematic drawing...