5.
Place the heater in its final position and mark the fixing holes through the location holes
visible through the back of the heater.
6.
Six fixing positions must be selected for models DESE100, DESE125, DESE150 and at least
4 fixing positions for models DESE050 and DESE070.
Fig. 6
.
Common fixing points for all heater sizes are shown in both
Fig. 4
and
Fig. 5
.
Mark the positions for the fixing holes towards the bottom of each slot, this allows the heater to
settle once the energy cells have been fitted.
Move the heater away from the wall, drill the holes and fit the wall fixings best suited to the
application.
Secure the heater to the wall using correct quantity of screws required per model, using the
appropriate screw fittings.
NB: Do not fully tighten screws until energy cells are fully loaded to ensure full weight is
on feet and not on the wall fixings.
NOTE: UNDER NO CIRCUMSTANCES SHOULD ANY SCREWS BE REMOVED WITHOUT
FIRST REMOVING ALL ENERGY CELLS FROM THE HEATER.
NEVER FREE THE HEATER FROM THE WALL WITH ENERGY CELLS REMAINING INSIDE
THE HEATER CAVITY.
NOTE: ANY FIXING DROPPED INTO HEATER MUST BE RETRIEVED AS THEY MAY
IMPACT PRODUCT SAFETY OPERATION.