background image

1/4”-20

P x 3/4” x 6

1/4”-20

P x 3/4” x 6

(A

)F

or

10

00

V

S

eri

es

(U

L

Lis

te

d)-

D

rill

&

ta

p

fo

r(6

)1

/4

"-2

0P x 3/4”

m

ac

hin

e

sc

re

w

s

fo

r

ex

it

de

vic

e.

D

rill

(6

)3

/1

6"

pilo

t

ho

le

s

fo

r

se

lf-

ta

pp

in

g

m

ac

hin

e

sc

re

w

s

or

w

oo

d

sc

re

w

s

fo

r

ex

it

de

vic

e.

(B

)F

or

F1

00

0V

(F

ire

R

ate

d)-

D

rill

9/3

2"

ho

le

s

in

sid

e

an

d

3/8

"h

ole

s

ou

tsid

e

fo

rth

e

(6

)th

ru

bo

lts

.

4

13

/3

2"

A

A

A

A

A

A

A

A

A

A

A

A

B

40

"a

bo

ve

flo

or

lin

e

Fo

ld

on

do

tte

d

lin

e

an

d

Round Head Screws

Round Head Screws

fit

on

do

or

ed

ge

1 3/16"

4

13

/3

2"

2

3/4

"

2

3/4

"

1 3/16"

40

"a

bo

ve

flo

or

lin

e

Fo

ld

on

do

tte

d

lin

e

an

d

fit

on

do

or

ed

ge

B

CENTER LINE

CENTER LINE

2012.03

1 19/32”

1 19/32”

1 19/32”

1 19/32”

(

)

When installing 1000R x 1000V on a pair of doors,a Double 

Door Strike (DDS) is required. F

or complete template 

information,please refer to the DDS template.

3/4" for LE-08

,

LE-08A

 Trim

3/4" for LE-08

,

LE-08A

 Trim

Содержание F1000V Series

Страница 1: ...F1000V Series FIRE RATED EXIT DEVICE INSTALLATION INSTRUCTIONS 2012 03 ...

Страница 2: ... Align vertical center line of top strike and upper connecting tube as shown on template B 1 Mark door as indicated on template B 1 2 Tighten screws to install top strike with proper adjustment STEP 2 MARK CENTER LINE ON DOOR Mark center line on inside of door Establish the horizontal center line of the device by drawing a line across the door 40 above floor line STEP 3 MARK DOOR AND DRILL HOLES 1...

Страница 3: ...ing bar is depressed or dogged down If they do not disengage adjust the bolt in the bottom latch assembly as needed and retest for proper operation STEP 9 INSTALL AND ADJUST LOWER CONNECTING TUBE 1 Keep the end of the tube with the threaded insert downward to connect it with the threaded bolt in the bottom latch assembly 2 Connect the other end of the tube to the internal mechanism of the head ass...

Страница 4: ... 1 4 20P x 3 4 5 PCS 14 x1 1 2 13 PCS Rod Connector 2 PCS Bottom Rod Self Tapping Flat Head HEAD COVER BODY ACTUATING BAR END COVER PARTS IDENTIFICATION Thru Bolts 10 PCS 1 4 x 1 1 4 8PCS Round Head Rod Guide Insert 2 PCS 1 4 x 1 4 PCS Round Head 8 x 5 8 4 PCS Round Head Round Head 1 4 20P x 3 4 4PCS Rod Guide 2PCS Self Tapping 5 32 x3 4 3 PCS 1 4 x 1 3 PCS Anchor 1 Top Rod ...

Страница 5: ...bolts 4 13 32 A A A A A A A A A A A A B 40 above floor line Fold on dotted line and Round Head Screws Round Head Screws fit on door edge 1 3 16 4 13 32 2 3 4 2 3 4 1 3 16 40 above floor line Fold on dotted line and fit on door edge B CENTER LINE CENTER LINE 2012 03 1 19 32 1 19 32 1 19 32 1 19 32 When installing 1000R x 1000V on a pair of doors a Double Door Strike DDS is required For complete tem...

Страница 6: ... Listed drill tap for 2 1 4 20Px3 4 machine screws C D for bottom latch assembly Or drill 2 3 16 pilot holes C D for self tapping machine screws or wood screws for bottom latch assembly B For F1000V Fire Rated drill 9 32 holes C D inside and 3 8 holes C D outside for the 2 thru bolts Note When installing bottom latch assembly 1 Drill 1 C hole and install screw but do not tighten all the way 2 Dril...

Страница 7: ...N DOOR FRAME FLAT HEAD MACHINE SCREW CAUTION Drill F hole after top latch assembly properly works FL TOP STRIKE TOP LATCH BOLT AT HEAD SCREW Adjust the location of the top latch assembly and top latch base so there is 3 32 space between top strike and inside of top latch bolt ROUND HEAD SCREW CAUTION FLAT HEAD MACHINE SCREWS 1 4 20P x 3 4 x 2 1 4 20P x 3 4 1 4 20P x 3 4 1 4 20P x 3 4 2012 03 1 G N...

Отзывы: