background image

T

O

P

 STRIKE

HEAD

ASSEMBLY

TOP LATCH

ASSEMBLY

BOTTOM  LATCH

ASSEMBLY

TOP LATCH

BASE

TOP LATCH COVER

ROD GUIDE

 TOP ROD

 THRU 

BOLTS x10

ROD GUIDE

INSERT

BOTTOM

ROD

ROD GUIDE

INSERT

 

 BOLT

CONNECTOR

ROD

CONNECTOR

ROD

ROD GUIDE

BOT TOM

LATCH

BASE

FLOOR STRIKE

BOT TOM

LATCH COVER

HEAD COVER

END COVER

Install rod guides onto top

 and bottom rods at the 

midway point 

Drill a 5/8" dia. hole in

he floor 1" deep, 

and align with center 

of bolt in bottom latch 

assembly

STEP 1 

DIRECTIONS FOR CHANGING

                 HANDING OF DEVICE

           Handing of device is preset at factory

           for RHR.To change handing of device,

           follow steps shown below and see 

           DRAWING FOR STEP 1.

           1.Loosen screws ’A’ and remove screw

              ‘B’ and spring ‘C’.

           2.Reverse the postions of screw ’B’ and

              spring ‘C’ and then tighten screw ‘A’.

           3.The device is now set for LHR.

  

STEP 5 

INSTALL TOP STRIKE

           1.Align vertical center line of top strike and

              upper connecting tube as shown on template 

              (B-1).Mark door as indicated on template 

              (B-1).

           2.Tighten screws to install top strike with

              proper adjustment.

STEP 2

MARK CENTER LINE ON DOOR

              Mark center line on inside of door. 

              Establish the horizontal center line of 

              the device by drawing a line across 

              the door 40” above floor line. 

 

 

STEP 3

MARK DOOR AND DRILL HOLES

           1.Fold and apply template (A) to edge of 

              door and mark door as indicated on 

              template (A).

           2.Drill holes A X 6 in accordance with the

              diameters as indicated on template (A)

STEP 4

INSTALL DEVICE BODY

           1.Remove the head cover from the device

              body and end cover from the mounting 

              bracket by removing the screws that hold 

              them on.

           2.Align tailpiece receiver of exit device and

              trim/cylinder tailpiece, so it slides onto 

              trim/cylinder tailpiece. Also align screw 

              holes on exit device head with mounting

              holes on the door.

           3.Install and tighten the mounting screws 

              for the head of the exit device and end

              cover mounting bracket.

Содержание F1000V Series

Страница 1: ...F1000V Series FIRE RATED EXIT DEVICE INSTALLATION INSTRUCTIONS 2012 03 ...

Страница 2: ... Align vertical center line of top strike and upper connecting tube as shown on template B 1 Mark door as indicated on template B 1 2 Tighten screws to install top strike with proper adjustment STEP 2 MARK CENTER LINE ON DOOR Mark center line on inside of door Establish the horizontal center line of the device by drawing a line across the door 40 above floor line STEP 3 MARK DOOR AND DRILL HOLES 1...

Страница 3: ...ing bar is depressed or dogged down If they do not disengage adjust the bolt in the bottom latch assembly as needed and retest for proper operation STEP 9 INSTALL AND ADJUST LOWER CONNECTING TUBE 1 Keep the end of the tube with the threaded insert downward to connect it with the threaded bolt in the bottom latch assembly 2 Connect the other end of the tube to the internal mechanism of the head ass...

Страница 4: ... 1 4 20P x 3 4 5 PCS 14 x1 1 2 13 PCS Rod Connector 2 PCS Bottom Rod Self Tapping Flat Head HEAD COVER BODY ACTUATING BAR END COVER PARTS IDENTIFICATION Thru Bolts 10 PCS 1 4 x 1 1 4 8PCS Round Head Rod Guide Insert 2 PCS 1 4 x 1 4 PCS Round Head 8 x 5 8 4 PCS Round Head Round Head 1 4 20P x 3 4 4PCS Rod Guide 2PCS Self Tapping 5 32 x3 4 3 PCS 1 4 x 1 3 PCS Anchor 1 Top Rod ...

Страница 5: ...bolts 4 13 32 A A A A A A A A A A A A B 40 above floor line Fold on dotted line and Round Head Screws Round Head Screws fit on door edge 1 3 16 4 13 32 2 3 4 2 3 4 1 3 16 40 above floor line Fold on dotted line and fit on door edge B CENTER LINE CENTER LINE 2012 03 1 19 32 1 19 32 1 19 32 1 19 32 When installing 1000R x 1000V on a pair of doors a Double Door Strike DDS is required For complete tem...

Страница 6: ... Listed drill tap for 2 1 4 20Px3 4 machine screws C D for bottom latch assembly Or drill 2 3 16 pilot holes C D for self tapping machine screws or wood screws for bottom latch assembly B For F1000V Fire Rated drill 9 32 holes C D inside and 3 8 holes C D outside for the 2 thru bolts Note When installing bottom latch assembly 1 Drill 1 C hole and install screw but do not tighten all the way 2 Dril...

Страница 7: ...N DOOR FRAME FLAT HEAD MACHINE SCREW CAUTION Drill F hole after top latch assembly properly works FL TOP STRIKE TOP LATCH BOLT AT HEAD SCREW Adjust the location of the top latch assembly and top latch base so there is 3 32 space between top strike and inside of top latch bolt ROUND HEAD SCREW CAUTION FLAT HEAD MACHINE SCREWS 1 4 20P x 3 4 x 2 1 4 20P x 3 4 1 4 20P x 3 4 1 4 20P x 3 4 2012 03 1 G N...

Отзывы: