Desco 19290 Скачать руководство пользователя страница 7

DESCO EUROPE

 - 2A DUNHAMS LANE, LETCHWORTH, HERTFORDSHIRE, SG6 1BE, UK

Phone: +44 (0) 1462 672005 • E-mail: 

[email protected]

, Website: 

DescoEurope.com

TB-3076.E

 Page 7 of 8

© 2018 DESCO INDUSTRIES INC

Employee Owned

Calibration

Frequency of recalibration should be based on the 

critical nature of those ESD sensitive items handled and 

the risk of failure for the ESD protective equipment and 

materials. In general, Desco Europe recommends that 

calibration be performed annually.
In-house calibration can be performed by using 

±1 % tolerance resistors in each of the meter's decade 

ranges. Connect the resistors to the test leads using 

clips and record the meter’s display. Minimise crossing 

the test leads when possible. Contact 

Desco Europe 

Customer Service

 should adjustments be necessary. 

Special equipment is required to adjust the meter.

Required Equipment

•  Digital Multimeter (±1.25 % accuracy @10 VDC and 

100 VDC)

•  Resistance Decade Box with a range of 10³ to 10

12

 

ohms (±2 % accuracy @ 10³ to 10

10

 ohms; ±5 % 

accuracy @ 10

11

 to 10

12

 ohms)

•  Thermometer (±1 °F accuracy)

•  Relative Humidity Meter (±2 % accuracy)

•  99 % Isopropyl Alcohol and Cleaning Wipes

Setup

•  Test Area

 - needs to be free of any high voltage 

transformers or power supplies and away from any 

type of fluorescent lighting or high power lighting.

•  Worksurface

 - needs to be covered with a 

grounded conductive mat at 1.0 x 10³ or less.

•  Technician

 - needs to be connected to equipment 

ground with a 0 ohm resistor in the ground cord.

•  Decade Box 

- needs to be connected to equipment 

ground.

Normalisation of the Meter

The temperature inside the testing area needs to be 

75 °F ±3 °F (23.9 °C ±1.7 °C) at 40 % to 60 % relative 

humidity. The meter needs to stay at a temperature of 

75 °F ±3 °F (23.9 °C ±1.7 °C) for approximately 1 hour 

for proper readings. The meter cannot be normalised 

inside objects, enclosed boxes, containers or cases. 

The temperature inside an enclosed case will differ 

from the outside temperature. These cases will act as 

insulators. The meter must remain stationary in the 

testing area for about 1 hour without any significant 

changes to the temperature.
NOTE: Accuracy is measured after normalising the 

meter for a minimum of 1 hour.

Calibration Verification Procedure

1.  Use only the test leads that were supplied with the 

meter. 

2.  Use 99 % isopropyl alcohol to clean the two test 

jacks located at the top of the meter. Oil from 

human fingers can affect the accuracy of the meter. 

3.  Connect the test leads to the test jacks located at 

the top of the meter. Connect the opposite end of 

the test leads to a DC voltmeter. 

4.  Press the red pushbutton. The measured voltage 

should start at 10 V ±5 % and increase to 100 V  

±5 % at the end of the test cycle. 

5.  Connect the test leads to the Resistance Decade 

Box. Apply the load resistance values indicated in 

the table below. The meter should display accuracy 

within ±10 % of the loaded resistance value.

Load 

Resistance (Ω) Accuracy

Display 

Value

Exponent 

LED

1 x 10

12

+20 %

1.20 x 10

12

12

-20 %

8.00 x 10

11

11

1 x 10

11

+10 %

1.10 x 10

11

11

-10 %

9.00 x 10

10

10

1 x 10

10

+10 %

1.10 x 10

10

10

-10 %

9.00 x 10

09

9

1 x 10

9

+10 %

1.10 x 10

09

9

-10 %

9.00 x 10

08

8

1 x 10

8

+10 %

1.10 x 10

08

8

-10 %

9.00 x 10

07

7

1 x 10

7

+10 %

1.10 x 10

07

7

-10 %

9.00 x 10

06

6

1 x 10

6

+10 %

1.10 x 10

06

6

-10 %

9.00 x 10

05

5

1 x 10

5

+10 %

1.10 x 10

05

5

-10 %

9.00 x 10

04

4

1 x 10

4

+10 %

1.10 x 10

04

4

-10 %

9.00 x 10

03

3

1 x 10

3

+10 %

1.10 x 10

03

3

-10 %

<1.0 x 10

03

<3

Содержание 19290

Страница 1: ...ooring system IEC 61340 4 5 A compliance verification plan shall be established to ensure the organization s fulfilment of the requirements of the plan Process monitoring measurements shall be conducted in accordance with a compliance verification plan that identifies the technical requirements to be verified the measurement limits and the frequency at which those verifications shall occur The com...

Страница 2: ...asurement Location Labels 25 Pack 222634 Replacement 2 27 kg Electrodes 50004 Replacement T Handles for 2 27 kg Electrodes 222002 Concentric Ring Probe Packaging 19290 Digital Surface Resistance Meter Kit 1 Digital Surface Resistance Meter 2 Test Leads 1 5 m Length 2 2 27 kg Electrodes 1 Electrode Spacer 25 cm 1 Electrode Spacer 91 cm 4 AA Alkaline Batteries 1 Ground Plug Adapter 1 Gator Clip 25 M...

Страница 3: ...ty battery life test voltage and resistance measurement D Power Switch Slide the switch to the left to power the meter OFF Slide the switch to the right to power the meter ON E Black Pushbuttons Each black pushbutton corresponds to the prompts on the bottom left and bottom right of the display These buttons are used to access the Settings and Memory Recall menus and scroll up and down between menu...

Страница 4: ...essed Q Erase all memory Erases all stored measurement transactions saved in the meter s memory R S Figure 7 Settings menu R Memory Slot Number Indicates the memory slot number S Resistance Measurement Indicates the resistance measurement value for the respective memory slot Operation General Guidelines Use both 2 27 kg electrodes for Resistance Point to Point Rtt measurements Use one 2 27 kg elec...

Страница 5: ...rounded point 4 Connect the red test lead to one 2 27 kg electrode and place the electrode on the furthest convenient point on the surface 5 Push the red pushbutton to perform a measurement Should the 15 second electrification period appear it may be bypassed by pushing the red pushbutton a second time 6 Push the right black pushbutton to save the measurement and apply an included measurement loca...

Страница 6: ...a once a month Cable jackets should also be cleaned in this fashion Cleaning the 2 27 kg Electrodes Clean the electrodes with a minimum 70 isopropanol water solution Make sure the 2 27 kg electrodes conductive pads are dry prior to use Figure 13 Measuring the Resistance Point to Point Rtt of floor materials Measure Resistance Point to Point Rtt on the Surface 1 Do not clean the surface 2 Remove fr...

Страница 7: ... area needs to be 75 F 3 F 23 9 C 1 7 C at 40 to 60 relative humidity The meter needs to stay at a temperature of 75 F 3 F 23 9 C 1 7 C for approximately 1 hour for proper readings The meter cannot be normalised inside objects enclosed boxes containers or cases The temperature inside an enclosed case will differ from the outside temperature These cases will act as insulators The meter must remain ...

Страница 8: ...cy 10 Relative Humidity Accuracy 10 integers Power Supply 4 AA alkaline batteries Battery Life Approximately 1 500 measurements Display OLED 2 7 diagonal 128 x 64 pixel resolution Memory Capacity 100 measurements Operating Temperature 41 ºF to 85 ºF 5 ºC to 30 ºC Environmental Requirements Indoor use only at altitudes less than 6500 ft 2 km Maximum relative humidity of 80 up to 85 F 30 C Dimension...

Отзывы: