background image

www.desatech.com

122273-01C

10

Venting inStallatiOn

Continued

FIRESTOP SPACERS (FS-10, 
1100EFS-10DM FOR 36" MODELS)

Firestop  spacers  are  required  at  each  point 
where the chimney penetrates a floor space. 
Their  purpose  is  to  establish  and  maintain 
the  required  clearance  between  the  chimney 
and the combustible materials. When the pipe 
passes through a framed opening into a living 
space above, the firestop must be placed onto 
the ceiling from below as shown in Figure 13.
They  also  provide  complete  separation  from 
one  floor  space  to  another  or  attic  space  as 
required by most codes. When the double wall 
pipe passes through a framed opening into an 
attic space, the firestop must be placed into an 
attic floor as shown in Figure 14.

Figure 13 - Firestop Spacer with Living 

Space Above Ceiling

Figure 14 - Firestop Spacer with Attic 

Space Above Ceiling

Existing 
Ceiling 

Frame

Firestop 

Spacer

Screws or 
Staples 
(Min. of 8)

Firestop 

Spacer

Screws or Staples 
(Min. of 8)

PENETRATING ROOF

To maintain a 1" (36" Models) or 2" (42/50" 
Models) clearance to the pipe on a roof with a 
pitch, a rectangular opening must be cut.
1.  Determine center point through which pipe 

will penetrate roof.

2.  Determine  center  point  of  roof.  Pitch  is 

distance the roof drops over a given span, 
usually 12". A 6/12 pitch means that roof 
drops 6" for each 12" measured horizon

-

tally down from roof rafters.

3.  Use roof opening chart (Figure 15, page 

11) to determine correct opening length 
and flashing required.

4.  Remove shingles around opening mea

-

sured. Cut out this section.

Existing 
Ceiling 

Frame

Figure 12 - Typical Offset Terminations

Return 
Elbow

Offset 
Elbow

Return 
Elbow

Offset 
Elbow

6' Max.

6' Max.

6' Max.

6' Max.

6' Max.

6' Max.

Return 
Elbow

Offset 
Elbow

Offset 
Elbow

Return 
Elbow

A

B

C

Offset 
Elbow

Ceiling 
Support Pipe
12S-12DM

Return 
Elbow

Содержание WCM-36J

Страница 1: ...orforusewithavent free gas log heater approved to ANS Z21 11 2 standard This wood burning fireplace complies with UL127 CAN ULS S610 M87 standard as a FACTORY BUILT APPLIANCE FOR CANADA The authority...

Страница 2: ...replace and refer to fire log warnings and caution markings on packaging prior to use Thisfireplaceisnotintendedtobe used as a substitute for a furnace to heat an entire home Use for supplemental heat...

Страница 3: ...mODELS 29 14 1 2 22 1 2 26 5 8 4 1 2 15 5 8 4 1 2 1 58 7 1 4 11 15 1 4 3 1 2 9 1 2 10 1 2 67 61 49 11 7 30 1 45 1 8 36 OUTSIDE AIR ACCESS GAS LINE ACCESS 36 HEARTH 1 5 16 19 13 16 Ref 35 3 8 22 18 3...

Страница 4: ...nued 42 Models 22 3 4 30 1 2 29 4 3 8 15 3 4 5 8 17 5 8 67 61 49 7 1 30 11 58 42 51 1 8 4 1 2 3 1 2 9 1 2 10 1 2 81 2 13 17 OUTSIDE AIR ACCESS GAS LINE ACCESS 23 13 16 Ref 1 5 16 41 3 8 25 22 1 2 42 H...

Страница 5: ...ontinued 50 Models 38 1 2 28 1 2 43 8 17 5 8 19 1 4 24 49 30 11 61 67 58 7 1 59 50 4 1 2 3 1 2 9 1 2 10 1 2 8 1 2 13 17 GAS LINE ACCESS OUTSIDE AIR ACCESS 23 13 16 Ref 1 5 16 33 49 3 8 22 1 2 50 HEART...

Страница 6: ...ges Figure 5 Corner Installation selecting location To determine the safest and most efficient location for the fireplace you must take into consideration the following guidelines 1 The location must...

Страница 7: ...stible material see Figure 6 WARNING Hearthextension is to be installed only as shown in Figure 6 Fireplace Installation Continued Figure 6 Hearth Extension Seal Gap Fireplace Front Ember Protector Fi...

Страница 8: ...s Figure 8 Outside Air Kit Secure to Collars with Metal Tape Screws or Straps Min of 1 4 x 20 in size Air Inlet Location Must Allow For Bushes or Snow Vent Hood Required for Wall Installation Air Inle...

Страница 9: ...e sections are locked to gether When installing double wall snap lock chimney together it is important to assure the joint between the chimney sections is locked Check by pulling chimney upward after...

Страница 10: ...ure 14 Firestop Spacer with Attic Space Above Ceiling Existing Ceiling Frame Firestop Spacer Screws or Staples Min of 8 Firestop Spacer Screws or Staples Min of 8 Penetrating roof To maintain a 1 36 M...

Страница 11: ...om Overlap Shingles Top and Sides Only Figure 16 Flashing Installation Flashing installation v6f 10dm or v12f 10dm Determine the flashing to be used with the roof opening chart Slide flashing over pip...

Страница 12: ...Min 10 3 Min 2 Min 3 Min Level of Flue Gas Outlet Figure 20 10 Foot Rule Terminations Spark Arrestor The fireplace system must be terminated with the listed round top or chase terminations In any cas...

Страница 13: ...t the gas valve is on apply soap and water solution to all connectionsandjoints Bubbles forming show a leak Correct all leaks at once DO NOT USE AN OPEN FLAME FOR LEAK TESTING AND DO NOT OPER ATEANYAP...

Страница 14: ...re 23 Hole in Side Panel to Attach to Firebox Wrapper Hole in Side Panel Brick Installation Each brick housing is stamped with a number full size bricks are not stamped These num bers will help identi...

Страница 15: ...4 F126 F126 F124 F123 F133 F011 Ash Brick 42 Hearth 36 Hearth RED IVORY QTY FULL 112140 01 FULL 112140 05 13 ASH BRICK 120848 01 ASH BRICK 120848 03 1 F011R F011W 1 F059R F059W 4 F123R F123W 2 F124R F...

Страница 16: ...LL 112140 05 7 F036R F036W 3 F143R F143W 2 F144R F144W 1 F147R F147W 1 F148R F148W 2 F158R F158W 3 F185R F185W 1 F191R F195W 1 F192R F192W 1 F148 F148 FULL FULL FULL FULL FULL F036 F036 F036 F158 F143...

Страница 17: ...017R F017W 1 F032R F032W 3 F033R F033W 3 F143R F143W 3 F151R F151W 1 F155R F155W 1 F156R F156W 1 F158R F158W 2 F186R F186W 1 F190R F190W 1 F155 F017 FULL FULL F032 FULL F033 F158 FULL FULL F032 FULL F...

Страница 18: ...144R F144W 1 F145R F145W 1 F146R F146W 1 F147R F147W 1 F148R F148W 2 F149R F149W 1 F158R F158W 3 F191R F191W 1 F192R F192W 1 F148 F149 F148 FULL FULL FULL F032 F033 F158 F143 FULL FULL FULL F032 F033...

Страница 19: ...05 3 F068R F068W 4 F071R F071W 1 F072R F072W 1 F074R F074W 2 F110R F110W 3 F112R F112W 1 F120R F120W 4 F122R F122W 4 F180R F180W 1 F181R F181W 1 F188R F188W 1 F 1 2 0 F 1 2 0 F 1 2 0 F 1 2 0 F 0 7 2...

Страница 20: ...71W 4 F072R F072W 2 F074R F074W 1 F100R F100W 3 F101R F101W 1 F162R F162W 1 F164R F164W 1 F165R F165W 1 F174R F174W 1 F U L L F 0 7 2 F 1 6 3 F175 or F182 F 1 6 9 F 0 6 4 F 0 6 4 F 0 6 4 F 0 6 4 F120...

Страница 21: ...83R F083W 3 F084R F084W 4 F085R F085W 1 F093R F093W 1 F166R F166W 1 F167R F167W 1 F172R F172W 1 F173R F173W 1 F183R F183W 1 F U L L F 0 7 2 F 1 6 3 F175 or F182 F 1 6 9 F 0 6 4 F 0 6 4 F 0 6 4 F 0 6 4...

Страница 22: ...VORY QTY FULL 112140 02 FULL 112140 06 17 S048R S048W 12 S049R S049W 10 S051R S051W 1 S052R S052W 2 FULL S048 S048 S048 S048 S048 S048 S048 S048 S048 S048 S048 S048 FULL FULL S049 S049 S049 S049 S049...

Страница 23: ...6 S077R S077W 6 S081R S081W 1 S082R S082W 1 FULL S077 S076 S046 S050 S046 S046 S046 S046 S077 S076 S077 S076 S077 S076 S077 S076 S077 S076 FULL FULL FULL FULL FULL FULL FULL FULL FULL FULL FULL FULL F...

Страница 24: ...12140 06 28 S048R S048W 12 S049R S049W 10 S051R S051W 2 S052R S052W 2 FULL S048 FULL FULL FULL S049 S048 S049 S048 S049 S048 S049 S048 S048 S048 S048 S048 S048 S048 S048 S049 S049 S049 S049 S049 S049...

Страница 25: ...59R S059W 1 S061R S061W 1 S062R S062W 1 S090R S090W 1 S091R S091W 1 F071R F071W 1 F120R F120W 1 F129R F129W 1 F U L L S 0 0 2 F U L L S 0 0 4 S 0 0 1 S 0 0 1 S 0 9 1 S 0 1 4 S 0 1 4 S 0 1 4 S 0 1 4 S...

Страница 26: ...1 S 0 8 4 S 0 7 4 S 0 7 4 S 0 7 4 S 0 7 4 S 0 7 4 S 0 7 4 S 0 0 2 S 0 0 2 S003 S003 F120 F129 RIGHT REFRACTORY RED IVORY QTY FULL 112140 02 FULL 112140 06 18 S001R S001W 2 S002R S002W 8 S003R S003W 2...

Страница 27: ...0 4 S 0 0 1 S003 F120 S093 or S099 F130 F U L L S 0 0 2 F U L L F U L L F U L L S 0 9 8 S 0 9 7 S 0 9 7 S 0 9 7 S 0 9 7 S 0 9 7 S 0 9 7 F 1 3 7 F U L L F U L L F U L L F U L L F U L L F U L L F U L L...

Страница 28: ...ng a Filler Pass This is done by filling the joint about 3 4 full with grout mixture It is important to work with only 6 bricks at a time so grout doesn t have time to set up before striking 6 Complet...

Страница 29: ...t end of screen rod with 10 x 5 8 to center of smoke shelf see Figure 26 5 Install other screen rod in same manner Brick Installation Continued Glass Door Installation Figure 28 Installing Bottom Door...

Страница 30: ...ou find the doors do not close properly or do not appear level or straight proceed with section on door adjustment Figure 29 Installing Bi Fold Doors Spring Clip Insert Pin into Spring Clip Pivot Hole...

Страница 31: ...ch materials as pitch wax laden logs very dry mill end lumber and large amounts of paper or cardboard boxes can create an excessively hot fire and should not be burned in this fireplace Always keep th...

Страница 32: ...up through the keyway slot will free damper blade to automatically open Pushing the handle forward and down will lock damper blade closed see Figure 32 Operation and Maintenance Guidelines Continued...

Страница 33: ...f this product If they can t supply original replacement part s call DESA Heating LLC at 1 866 672 6040 When calling DESA Heating LLC have ready your name your address model and serial numbers of your...

Страница 34: ...satech com 122273 01C 34 Parts Models V Jm36 Sr SI HR HI V Jm42 Sr SI HR HI V Jm50 Sr SI HR HI WCM 36J WCM 42J WCM 50J 1 25 24 6 7 8 11 10 12 13 14 17 18 16 15 9 30 29 3 31 23 20 2 19 27 28 26 19 5 22...

Страница 35: ...01 Conduit One 2 18 109752 02 Conduit Two 2 19 109726 01 Air Duct 6 20 Heat Shield Support 1 21 123298 01 Ash Box Assembly 1 22 Ash Box Ring 1 23 Hearth Support Brace 1 24 Inner Dome Assembly 1 25 Smo...

Страница 36: ...ts follow the instructions listed under Replacement Parts on page 33 of this manual M K 3 6 S S R I PART NO DESCRIPTION QTY 120842 01 36 Split Stack Left 1 120842 02 42 Split Stack Left 1 120842 03 50...

Страница 37: ...C 50 Oiled Bronze Double Wall Pipe 12 12DM 18 12DM 24 12DM 36 12DM 48 12DM 12 12HT 18 12HT 24 12HT 36 12HT and 48 12HT 30 Offset and Return 30E 12DM and 30E 12HT Optional Outside air kit for floor ins...

Страница 38: ...www desatech com 122273 01C 38 AccessorIES Continued SQUARE CHASE TOP TERMINATION STL 12D AND STL 12DMP BLACK Round ToP TErminations RLT 12D and RLT 12HT...

Страница 39: ..._____________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ _____...

Страница 40: ...DESA Heating LLC 2701 Industrial Drive Bowling Green KY 42101 www desatech com 1 866 672 6040 NOT A UPC 122273 01 Rev C 04 08 122273 01...

Отзывы: