www.desatech.com
116686-01A
5
FRAMING
Figure 4 shows a typical framing of this heater us-
ing combustible materials. All required clearances
to combustibles must be adhered to. Header height
is measured from the base of the heater.
Tools and building supplies required for
installation:
• Saw
• Square
• Pliers
• Gloves
• Hammer
• Level
• Phillips screwdriver
• Framing materials
• Tape measure
• Surround
• Wall-finishing materials • Caulking material
• Electric drill/bits
LOCATING FIREPLACE
Continued
CAUTION: Provide adequate
clearances around the air open-
ings and adequate accessibility
clearances for servicing and
proper operations.
Figure 4 - Framing Heater for New
Construction/Renovation
3/4" - 1/2"
Note:
The height
that a combustible
mantel is fitted
above the heater
is dependent on
the height of the
front selected. The
minimum height is
1" above the front.
26
3
/
4
"
27
Header
Height
13"
INSTALLATION
WARNING - RISK OF FIRE!
The power cord must not be
pinched or against a sharp edge.
Secure cord to avoid tripping or
snagging to reduce the risk of fire,
electric shock or personal injury.
Do not run cord under carpet-
ing. Do not cover cord with
throw rugs, runners or the like.
Arrange cord away from traffic
areas and where it will not be
tripped over.
WARNING - RISK OF FIRE!
To prevent a possible fire, do
not block air intake or exhaust in
any manner. Do not use on soft
surfaces (like a bed) where open-
ings may become blocked.
WARNING - RISK OF FIRE!
Do not blow or place insulation
against the firebox.
WARNING: This heater is
tested and listed for use only
with the approved optional ac-
cessories. Use of optional ac-
cessories not specifically tested
for this heater could void the
heater warranty and/or result in
a safety hazard.