![Denison Hydraulics Goldcup 24 Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/denison-hydraulics/goldcup-24/goldcup-24_service-information_2480227025.webp)
ASSEMBLY PROCEDURE
CONTROL COVER ASSEMBLY
(Continued)
PORT BLOCK ASSEMBLY
PORT BLOCK INSTALLATION
24
FIGURE 8
11
10
Install the cover assemblies (14) & (15) over the dowel pins on the housing pads and
secure with seal (12) and screws (13). Torque to 30 lbs-ft., 40,8 Nm.
See figure 8
. Position the port block (1) on a clean flat surface with two open ports up.
The finished faces must not be scratched or damaged.
Compress the ring checks (3) and install in the tw o system ports and align holes in the
rings with the side holes in the por t walls.
Place lockwashers (5) on screws (4) and install screws through port wall and ring
checks and thread into nut (3). Torque to 10 lbs-ft., 13,56 Nm.
Install two check valve assemblies (7) in valve face of port block. Torque to 30 lbs-ft.,
40.8 Nm.
Install nine hex. hd. soc. plugs (9) and o-rings (8) into port block. Torque to 16 lbs-ft.,
22 Nm.
Install hex. soc. plugs (10) and o-ring (11) into port block. Torque to 50 lbs-ft., 68 Nm.
Install “AVSEAL”
Ò
plugs (2) into port block.
PARTS LIST FOR FIGURE 8
(P24/30P)
(P24/30S)
item
description
part no.
S23-15105
S23-15127
quantity
quantity
1
port block
033-91564
1
—
port block w/shuttle (S)
033-91604
—
1
3
ring check
033-72355
2
2
4
soc. hd. cap screw
359-11140
2
2
5
lockwasher
348-10016
2
2
6
ring check nut
033-72356
2
2
7
check valve assembly
S13-40266
2
2
8
o-ring
691-00906
9
9
9
hex. soc. plug
488-35041 13 13
10
hex. soc. plug
488-35018
3
6
11
o-ring
691-00908
3
6
See figure 9
. Position the pump with open end of the housing assemb ly (6) facing up.
Install new gasket (5) on the housing. Do not use gasket compound.
Install two port plate pins (3) in the face of the port block assembly (2) and the dowel
pins (7) into mounting surface of port block.
Insert lifting eyes into tapped holes in each system por t mounting surface.
Apply heavy grease to the rear of the por t plate (4) and install over the port plate pins.
Temporarily attach port plate to port block by inserting a cord through one of the 2”,
50,8 mm diameter ports down through the port block port, through arcuate in the por t
plate, around web, back through port block and tie ends of the cord to lifting e ye.
Repeat this step to the other side of the por t plate.
Install the port block assembly over the auxiliary shaft and position onto tubes and
dowel pins while engaging pressure feed tubes.
CAUTION:
Use extreme care and slowly lower the port block carefully onto the four
tubes which are precision fit in the por t block. Check when the block is within 1/2”,
12,7 mm of seating that the tubes are square in the holes and the por t plate is seated
firmly against the block. Lower the block until the joint is closed.
Install the six bolts and w ashers (8) & (9) & (1) & (10). Do not drop the bolts in place
as the threads will be damaged. Torque bolts evenly. Torque bolts (1) in 50 lb., 67,8 Nm
increments to 450 lbs-ft., 610 Nm and the tw o bolts (8) to 120 lbs-ft., 163 Nm tighten-
ing in turn all six bolts. Torque two bolts, Fig.6 items to 120 lbs-ft., 163 Nm.
CAUTION:
Exercise extreme care to prevent damage to the valve mounting surface
while installing and torquing the top bolts .
9
9
9
www.comoso.com