bio.x C500 135147
Page 5 of 12
07/2008
5. Initial Operation
After removing the packaging, check the unit casing and operating components for any possible damage
caused in transit. If such damage is found, do not connect the unit to the mains. Report damage immediately
to the carrier who delivered the unit and to DENIOS AG at the service number indicated above. The original
packaging should be kept.
Place the unit in a dry, stable location as required.
The floor must be level. If necessary, level out any uneven surfaces with suitable shimming material.
5.1 Electrical connection
The unit is connected to the customer's mains supply via the power cable and plug.
Mains voltage:
The voltage of the power source has to comply with the details on the identification place of
the appliance
Warning: The mains supply must be fitted with a residual current protective device in accordance with
DIN VDE (Association of German Electricians) 0100! (See section 2)
5.2 Filling with the cleaning fluid
Two different cleaning fluids can be used in the Part Cleaning Unit C500.
a) Bio-Power
cleaning
fluid
•
Pour 100 l (5 canisters) of Bio-Power cleaning fluid into the tank.
•
Connect the unit to the mains. "On" will be shown on the display for 3 seconds. The heating system
switches on automatically. The warming-up process can take up to 2.5 hours, depending on the initial
temperature. The operating temperature is set at 41º C in the factory and cannot be changed. When the
operating temperature is reached, "41" will appear on the display.
The aerator will work continuously after the unit is switched on.
•
Once the operating temperature is reached add the additive with the micro-organisms (1 can x 100 g) to
the fluid. The micro-organisms take 24 hours to become active. It is therefore recommended to set up the
unit for operation just before the weekend, for instance.
The parts cleaning unit is then ready for operation.
b) bio.x detergent (ready-for-use solution incl. micro-organisms)
•
Pour 100 l (5 canisters) of Bio-Power cleaning fluid into the tank.
•
Connect the unit to the mains. "On" will be shown on the display for 3 seconds. The heating system
switches on automatically. The warming-up process can take up to 2.5 hours, depending on the initial
temperature. The operating temperature is set at 41º C in the factory and cannot be changed. When the
operating temperature is reached, "41" will appear on the display.
The parts cleaning unit is then ready for operation.
The aerator will work continuously after the unit is switched on.
The two detergents should not be mixed together as far as this is possible.
Other detergents such as degreasers or alkali cleaning agents must not be used.
6. Control panel
Multi-control button
Display
LED heater