7. Commissioning
Installation and Operation Manual for RPI M50A
52
7.
Commissioning
The inverter must be correctly installed, see
“6. Installation”, p. 37
.
For information on how the display is operated, see
“4.3 Display, buttons, status LEDs”, p. 12
.
DISCONN AC/DC
OFF
ON
To execute commissioning, the inverter needs to be powered either by AC
(the grid) or DC (the solar modules).
After powering up the inverter for the fi rst time, the
Select language
dialog
is shown.
➔
Français
Deutsch
English
Select language
1.
Use the buttons
and
to select language
English
.
To confi rm your selection, press the button
ENT
.
CHINA 2013
CHINA MV
CZECH
ENGLAND
FRA-Is 50HZ
2.
Use the buttons
and
to select your country or grid type.
To confi rm your selection, press the button
ENT
.
YES / NO
United Kingdom
set country:
Are you sure to
3.
If the selected country is correct, use the buttons
and
to
select the entry
YES
.
To confi rm your selection, press the button
ENT
.
If you want to change your selection, press the button
ESC
.
→
The inverter starts a self-test which takes approximately 2 min-
utes. A countdown shows the remaining time on the display.
þ
The basic setup is fi nished. The standard menu is shown.
E-actuelle: 0kWh
Puissance: 0W
Etat: On Grid
10.Sep 2014 15:32
►
Check chapter
“8. Settings”, p. 53
whether you need to adjust addtional set-
tings.
Содержание RPI M50A_120
Страница 1: ...Installation and Operation Manual RPI M50A_120 RPI M50A_122 Europe...
Страница 9: ...9 Installation and Operation Manual for RPI M50A 3 Intended use...
Страница 107: ......