I
NSTALLATION
G
UIDE
34
I
NSTALLATION
P
OWERING
U
P THE
I
NVERTER AND
S
ELF
-
TEST
5.9. First Time Powering Up
5.9.1. Before Powering Up
1. Check the PV array.
Note:
The PV array open circuit DC voltage must be greater than 500Vdc and less than
1000Vdc.
a. Measure the PV array open circuit DC voltage across the DC positive (+)
and negative (-) terminals in DC distribution.
2. Check the AC utility voltage.
Use an AC voltmeter to measure the AC utility voltage. The voltage level should
be at the nominal value of 270Vac or 315Vac Line to Line.
5.9.2. Powering Up the Inverter and Self-test
1. Configure the PV inverter settings.
To provide power to the inverter, switch on the DC switch. The LCD display
would be worked normally after 40seconds.
a. For the first time start-up, the
Select Country
screen is displayed. High-
light a country in the list by pressing the up
▲
or down
▼
buttons and press
ENT
to select or
EXIT
to cancel.
b. Verify the language you selected is correct by pressing
ENT
for
Yes
or
EXIT
for
No
. Select
No
to return to the previous screen.
c. The
Select Language
screen is displayed. Highlight a language by press-
ing the up
▲
or down
▼
buttons and press
ENT
to select or
EXIT
to cancel
and return to the first screen.
d. The
Main Menu
screen is displayed. Highlight
E-Today
by pressing the up
▲
or down
▼
buttons and press
ENT
to select or
EXIT
to cancel.
e. The
E-Today
screen is displayed while the inverter performs a self-test. If
the self-test passes. the
System Boot Countdown
screen is displayed. If
the self-test fails,
the test is performed again
.
f. The
System Boot Countdown
screen is displayed and the countdown
begins. Press
EXIT
to return to the
Main Menu
screen.
g. The
Main Menu
screen is displayed. Highlight
Power Meter
by pressing
the up
▲
or down
▼
buttons and press
ENT
to select.
h. The
Power Meter
screen is displayed. Confirm input and output
information and press
EXIT
to return to the main menu screen.
Содержание PhotoVoltaic RPI-C500
Страница 1: ...PhotoVoltaic Inverter RPI C500 PV Inverter ...
Страница 26: ...INSTALLATION GUIDE 20 INSTALLATION DC CONNECTION Figure 5 4 Dimensions of the DC connection lugs ...
Страница 31: ...INSTALLATION GUIDE 25 INSTALLATION AC CONNECTION Figure 5 9 Dimensions of the AC connection lugs ...
Страница 88: ...INSTALLATION GUIDE 82 ...
Страница 89: ...光伏逆变器 RPI C500 光伏逆变器 ...
Страница 100: ...安装手册 5 产品外观 外部三角视图 3 2 2 外部三角视图 图 3 2 外部后视图 进气孔 ...
Страница 107: ...安装手册 13 运输和安装准备 使用起重机 搬运时不含包装纸箱和栈板 1 将逆变器前门和后门打开 2 松开上盖的螺丝 图 4 9 松开上盖的螺丝 3 拆掉逆变器的上盖 图 4 10 拆掉逆变器上盖 ...
Страница 114: ...安装手册 20 安装说明 DC 端连接 图 5 4 DC 端连接端尺寸图 ...
Страница 116: ...安装手册 22 安装说明 AC 端连接 5 3 AC 端连接 1 如图 5 6 所示将连接到 AC 端的电缆穿过底板 图 5 6 AC 端配线 ...
Страница 119: ...安装手册 25 安装说明 AC 端连接 图 5 9 AC 端连接端尺寸图 ...
Страница 156: ...安装手册 62 维修保养 更换风扇模块 7 维修保养 7 1 更换风扇模块 1 按拉且扭转把手 之后打开后门 图 7 1 按拉扭转把手 ...
Страница 157: ...安装手册 63 维修保养 更换风扇模块 2 将需置换的风扇模块上的电源接头拔除 图 7 2 拔除电源接头 3 松开锁附在下风扇与机壳上的螺丝和螺帽 然后将下风扇移除 图 7 3 松开下风扇的螺丝和螺帽 ...
Страница 158: ...安装手册 64 维修保养 更换风扇模块 4 松开锁附在上风扇与机壳上的螺丝 然后将上风扇移除 图 7 4 松开上风扇的螺丝 ...
Страница 159: ...安装手册 65 维修保养 更换进气口滤网 7 2 更换进气口滤网 1 按拉且扭转把手 之后打开后门 图 7 5 按拉扭转把手 2 松开锁附在滤网盖与后门上的螺丝 之后打开滤网盖 图 7 6 松开滤网盖上的螺丝 ...
Страница 160: ...安装手册 66 维修保养 更换进气口滤网 3 松开锁附在滤网上的螺丝 图 7 7 松开滤网的螺丝 4 取出滤网 图 7 8 取出滤网 ...
Страница 161: ...安装手册 67 维修保养 清理排气孔滤网 7 3 清理排气孔滤网 1 将逆变器前门打开 2 松开排气孔滤网挡板上的螺帽 图 7 9 松开排气孔滤网的螺帽 3 把排气孔滤网挡板向右移动 图 7 10 将挡板向右移动 ...
Страница 162: ...安装手册 68 维修保养 清理排气孔滤网 4 直接取出挡板和排气孔滤网 图 7 11 取出排气孔滤网 ...
Страница 165: ...安装手册 71 维修保养 更换 SURGE PROTECTION DEVICE 4 退出已损坏的 SPD 并更换新的 Figure 7 15 退出已损坏的 SPD ...
Страница 176: ...Version 01180521 5013209808 ...