22/32
2016/01 - Indice de révision : D - Code : 35101
IV. PREPARATION FOR ASSEMBLY
1) Seating the mechanical assembly
Once you have decided which end of the pool the
cover will be installed on, carry out the following
preparations (if necessary) :
Trim the coping nose on each side as shown in
the following diagram:
?
The amount L by which the coping should be
trimmed (as measured from the nose of the coping
on the back wall) will depend on the length of the
slat apron and the radius of the pool corner:
Length of the
slat apron
"L" (in cm)
right angle
"L" R15 (in cm) "L" R20 (in cm) "L" R225 (in cm) "L" R30 (in cm)
8 m
38
38
43
48
53
9 m
39
39
44
49
54
10 m
40
40
45
50
55
11 m
41
41
46
51
56
12 m
42
42
47
52
57
Nez de margelle
Taille
Surfaçage
Rayon de bassin
If the coping underneath the proposed site of
the stands is not flat, it may be resurfaced (see
opposite).
Zone to be levelled
Zone to be trimmed
Level with the wall
Pool width
Coping nose
Cut
Resurfacing
Pool radius
Содержание EVODECK EC
Страница 15: ...15 32 2015 11 Indice de r vision C Code 35101 Notes...
Страница 16: ...16 32 2016 01 Indice de r vision D Code 35101...
Страница 31: ...31 32 2015 11 Indice de r vision C Code 35101 Notes...
Страница 32: ...32 32 2016 01 Indice de r vision D Code 35101...