32
8.
Open ¼” Ball Valve on Keg to pressurize the keg. Do not exceed 15 PSI. See
Figure 6-11
.
Figure 6-11. Open Ball Valve on Keg
9. Make sure lid VENT valve is open on the CUP, then open the lid INLET valve and begin
filling. The INLET valve is attached to the center of the lid with the 4-inch Triclamp. See
Figure 6-12.
View liquid fill levels through the lid sight glass and close the INLET valve
when the desired fill level is achieved
– usually 1-inch above the material bag. Never fill
over the top of the basket. Recommended fill level is ½-inch to 1-inch below the top of
the basket.
Figure 6-12. Loading the System Bask
et