Delta Membranes AlertMaxx2 Скачать руководство пользователя страница 11

AlertMaxx2

 11

13.0  Activating & testing the AlertMaxx2 unit

Before going through the testing process, ensure the mains power to the AlertMaxx2 unit is isolated.

13.2 

Turning on the AlertMaxx2 unit for the first time

1.  Ensure the small black switch on the main PCB is set to the ‘

NO-SEU

’ position.

2.  Remove the plastic covers on the battery terminals and connect the red and black leads from the PCB on    

 

to the battery, red to red and black to black. 

3.  Resecure the battery to the unit by pressing the Velcro on the battery hard against the Velcro on the unit    

 

until a ‘click’ is heard.

4.  Once the battery has been connected, the alarm will beep three times and the display will pulse in a  

 

 

left to right startup sequence.

5.  After approximately 20-60 seconds, the display will flash a 

P1 

error code.

6.  Refit the front fascia.

7.  Turn on the mains feed supplying the AlertMaxx2 unit, within 20 seconds the 

P1

 code will disappear and    

 

the green LED will flash once every 2 seconds.

13.3 

Testing the AlertMaxx2 unit

1.  Test the alarm by pressing and holding the ‘FUNC’ button for 3-5 seconds and release. The alarm will  

 

 

sound and the display will show an 

F1

 code.

2.  Press the ‘RESET’ button to clear the error code and sound.

3.  Test the float switch by raising the float switch to its upright position. The alarm will activate within  

 

 

10-15 seconds.

4.  Release the float switch. The sounder will stop within 30 seconds and the display will flash an 

F3

 code. 

 

 

Press the ‘RESET’ button, the green LED will flash once every 2 seconds and the error code will clear.

5.  Activate the float switch on the pump to start the pump. The display will show a cycling graphic which  

 

 

indicates the pump is running.

6.  The activation & testing is now complete and the AlertMaxx2 unit is ready for use.

Once the AlertMaxx2 has been installed and fully tested, please apply one of the chamber location stickers, 

(provided in the box), to the main label of the AlertMaxx2 fascia and one to its relevant fuse spur. This is to signify 

which pump station the high level alarm is connected to and which spur/s feed it.

CAUTION!

If the battery is misconnected to the AlertMaxx2 (i.e. black to red), this will destroy the unit. This can 

be detected by the manufacturer and will void the warranty.

13.1 

Connecting the ribbon cable

On supply, the ribbon cable that is used to pass communication between the PCB on the fascia and the  

motherboard is disconnected from the terminal on the motherboard. 

This must be connected before proceeding to section 13.2 

See highlighted area in PURPLE on figure 6 (page 10)

 for terminal block location.

Содержание AlertMaxx2

Страница 1: ...Installation Operating Manual Pump Station High Level Alarm AlertMaxx2 Foul Water DMS 299...

Страница 2: ...processed for any other purpose nor otherwise transmitted published or made available to a third party without express written consent from Delta Membranes Subject to technical modification without pr...

Страница 3: ...ng a pump to the AlertMaxx2 8 11 0 Installing a pendant float into a foul water chamber 9 12 0 Connecting a pendant float to the AlertMaxx2 unit 10 13 0 Activating testing the AlertMaxx2 unit 11 13 1...

Страница 4: ...gs Nuts 1 x Small Cable Gland Nut 2 x Small Blanking Plugs Nuts 1 x 6V Battery 2 2 AlertMaxx2 unit contents 1 x AlertMaxx2 Unit 1 x Chamber Location Sticker Sheet For AlertMaxx2 1 x Chamber Location S...

Страница 5: ...it suitable wall plugs in to the chosen wall for installation ensure correct wall plugs are used for the wall type 3 Secure the AlertMaxx2 unit to the wall using appropriate screws for the wall plugs...

Страница 6: ...AlertMaxx2 High Level Alarm DMS 269 2 For internal wiring of the high level alarm please refer to the AlertMaxx2 instruction manual The pump is supplied with a 10m cable When only using the standard...

Страница 7: ...ect the power cable to the corresponding terminal block on the main PCB figure 2 WARNING Ensure mains power is isolated before connecting and wiring to the AlertMaxx2 unit Figure 2 Connecting mains po...

Страница 8: ...AlertMaxx2 8 AlertMaxx2 1 Using the remaining cable gland previously installed in section 9 0 feed the pump cable through the gland and connect to the corresponding terminal block on the main PCB figu...

Страница 9: ...float weight 2 Using a cable tie secure the float weight to the float cable so there is 80mm of float cable between the top of the float switch and the bottom of the float weight 3 Drill a hole throu...

Страница 10: ...e AlertMaxx2 unit 4 Connect the black and blue cables from the float switch cable to the terminal strip figure 6 The brown cable should be disregarded and isolated to avoid possible shorting PLEASE NO...

Страница 11: ...error code and sound 3 Test the float switch by raising the float switch to its upright position The alarm will activate within 10 15 seconds 4 Release the float switch The sounder will stop within 3...

Страница 12: ...outside these parameters the device must be powered by an external power supply You can use the AlertMaxx2 to power external devices with a maximum voltage of 6 7V 17 0 Spares Part No Description DMS...

Страница 13: ...e SEU card Please contact PPS to rectify E4 No response from server Please contact PPS to rectify E5 Cannot find PowerMaxx The AlertMaxx2 cannot communicate with the PowerMaxx the units will continue...

Страница 14: ...tch is broken replace float switch Float cable is broken replace float switch The alarm does not activate when pressing the FUNC button for 3 5 seconds Faulty unit Alarm continuously active Float has...

Страница 15: ...3m of 4 core MaxxConnect family cable The AlertMaxx2 can only be connected to PowerMaxx PowerMaxx and Hi PowerMaxx which is running the software version 3 0 or higher This can be identified by the so...

Страница 16: ...service engineers to maintain enhance replace equipment Passionate Bespoke design manufacturing installation ensuring our equipment is fit for every requirement Service From fitting to scheduled maint...

Отзывы: