8
3.2 Installation Condition
Make sure that the installation location meets the following conditions:
The area is completely water proof.
The floor is flat and level.
There are no flammable or explosive materials.
The ambient temperature is within the range from 0
°
C to 50
°
C.
The temperature and humidity is maintained at a constant level.
There is minimal dust and dirt in the area.
Installation Procedure
(WARNING: In order to avoid electrical shock or other injury, inspect existing electronic or
plumbing installations before drilling holes. The battery is heavy, please handle with care to avoid
damage to the product or injury to the installer.)
1.Choose suitable firm wall with thickness greater
2.Use the mounting frame as a template, mark the hole position.
3.Drill holes according to the hole position
4.Hammer the M8 screws to the above holes, and screw the nut. Note: Do not position screws
flush to the wall - leave 10 to 20 mm exposed.
5.Fix the mounting frame to the screws.
6.Raise the battery a little higher than the mounting frame whilst maintaining the balance of the
battery. Hang the battery on the frame through the match hooks.
A. Power On
Double check all the power cable and communication cable.
(1) Switch power on
Switch on all the battery modules and the green LED light below will be on:
4.1 Precautions before installation
1) After unpacking, please check product working or not
2) Before installation, be sure to cut off the grid power and make sure the battery is in the
turned-off mode;
3) Wiring must be correct, do not mistake the positive and negative cables, and
ensure no short circuit with the external device;
4) It is prohibited to connect the battery and AC power directly;