dellonda DG5 Скачать руководство пользователя страница 10

WEEE REGULATIONS

Dispose of this product at the end of its working life in compliance with the EU Directive on Waste Electrical and Electronic Equipment 
(WEEE). When the product is no longer required, it must be disposed of in an environmentally protective way. Contact your local solid 
waste authority for recycling information.

Dellonda Ltd., 

Kempson Way, Suffolk Business Park, Bury St Edmunds, Suffolk. IP32 7AR

 

01284 757575         [email protected]            www.dellonda.co.uk

ENVIRONMENT PROTECTION

Recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be sorted, taken to 
a recycling centre and disposed of in a manner which is compatible with the environment. When the product becomes completely 
unserviceable and requires disposal, drain any fluids (if applicable) into approved containers and dispose of the product and fluids 
according to local regulations.

Note

: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior 

notice.

Important

: No Liability is accepted for incorrect use of this product.

Warranty

: Guarantee is 12 months from purchase date, proof of which is required for any claim.

Original Language Version

D

G5, DG6  Issue:6 (3,4,5)   30/06/2021

Содержание DG5

Страница 1: ...15kg maximum capacity 9 Protect the product from strong wind to prevent tilting 9 Only use on level ground capable of supporting the weight of the heater and the gas cylinder 8 DO NOT connect the gas...

Страница 2: ...Language Version PART DESCRIPTION QTY A Reflector 1 B Flame screen 1 C Glass tube 1 D Upper support 4 E Protective guard 4 F Black silicone ring 1 G Side panel 3 H Front panel 1 I Gas hose 1 J Control...

Страница 3: ...shown in Fig 3 5 5 After connecting the hose into the control unit J slide the hose clip back to near the end of the hose and tighten with a screwdriver Fig 2 NOTE Ensure you leak test this joint as d...

Страница 4: ...e J Before moving onto unit assembly check for the correct orientation of all components Fig 5 Original Language Version DG5 DG6 Issue 6 3 4 5 30 06 2021 Back of unit Igniter Ignition switch Control k...

Страница 5: ...correctly The wheels on the bottom plate N are the back of the unit and the magnetic catches on the middle plate J for the door are on the front of the unit these parts must be on OPPOSITE sides of t...

Страница 6: ...behind the front door use 2 x M5 x 12 screws 5 13 DIAGRAM 4 Assemble the middle support Insert the 4pcs upper support Secure with 8 x 3 16 screws 5 14 DIAGRAM 5 Fix the flame screen to the upper supp...

Страница 7: ...the black silicone ring is attached to the lower edge of the glass tube as illustrated Slide the glass tube through the hole of the lower plate cover and onto the middle plate Check and ensure that t...

Страница 8: ...lly and firmly onto the cylinder valve Confirm full and secure engagement of regulator to the cylinder valve NOTE Ensure you leak test this joint as directed in Section 6 after assembly is complete an...

Страница 9: ...3 7 1 4 After the pilot flame lights turn the control knob to its maximum position and leave it there for 5 minutes or more before turning the control knob to the desired temperature position WARNING...

Страница 10: ...em as waste All tools accessories and packaging should be sorted taken to a recycling centre and disposed of in a manner which is compatible with the environment When the product becomes completely un...

Отзывы: