Figure 6. Four-post threaded installation
2
For each rail, attach the front and back flanges to the post flanges with two user-
supplied screws at each end.
S5048F-ON switch installation
For the 1U two-post configurations, slide the switch into the rails in the same manner as the
four-post configurations.
S5048F-ON switch installation
19