
Chapter 5.
Servicing the Rack Cabinet
5-15
Priority
Equipment
Rule
1
Smart-UPS
From U1 upward
1
KVM Switch / KVM LCD
Between U19 / U21, contiguously
2
Blade Chassis
From U1 upward, above UPS
2
Ethernet / Fiber Switches
Between U22 / U25 or U39 / U42
2
Libraries
Between U29 / U39
3
Storage Devices
From U1 upward, above UPS and
/ or Blade Chassis
4
3-U / 4-U Servers
From U18 downward, then U22
upward
5
1-U / 2-U Servers
From U18 downward, then U22
upward, above 3-U /4-U Servers
and / or UPS / Blade Chassis
Содержание M3S2G8
Страница 4: ......
Страница 20: ......
Страница 46: ...4 14 Installation and Service Guide 4 Stick some wire saddles on the inside of the door Rear view ...
Страница 48: ...4 16 Installation and Service Guide 4 Install the door central part on the outside of the door Front view ...
Страница 60: ...4 28 Installation and Service Guide 4 Install the door central part on the outside of the door Front view ...
Страница 67: ...Chapter 4 Servicing the Doors 4 35 4 Stick some wire saddles on the inside of the door Rear view ...
Страница 69: ...Chapter 4 Servicing the Doors 4 37 4 Install the door central part on the outside of the door Front view ...
Страница 80: ...5 4 Installation and Service Guide 5 Proceed in the same way from the rear of the cabinet ...
Страница 84: ...5 8 Installation and Service Guide 5 Proceed in the same way from the rear of the cabinet ...
Страница 96: ......
Страница 100: ......
Страница 106: ......