March 2013
Dell EqualLogic Configuration Guide v14.1
1-15
Figure 7
PS6100 vertical port failover process and optimal connection paths
1.4.5
Vertical port failover behavior in PS4110/PS6110 controllers
In PS Series controllers prior to PS4110/6110 families, a link failure or a switch failure was not
recognized as a failure mode by the controller. This caused a failure of a link or an entire switch to
reduce bandwidth available from the array. Referring to Figure 4 or Figure 5, assume that CM0 is the
active controller. In vertical port failover, if CM0 senses a link drop on the local ETH0 port connection
path, it will automatically begin using the ETH0 port on the backup controller (CM1). Vertical port
failover is bi-directional. If CM1 is the active controller then vertical port failover will occur from CM1
ports to CM0 ports if necessary.
Note:
The PS4110 and PS6110 PS Series Arrays do not support dual speed connectivity.
They are not designed to support the auto-negotiate feature. The connectivity must be
10Gb ONLY - This is the only supported configuration.
Содержание EqualLogic PS4100E
Страница 18: ...March 2013 Dell EqualLogic Configuration Guide v14 1 1 9 Figure 2 Fully connected controller failover ...
Страница 54: ...March 2013 Dell EqualLogic Configuration Guide v14 1 6 45 Figure 13 Replication Process ...
Страница 86: ...March 2013 Dell EqualLogic Configuration Guide v14 1 7 77 Figure 27 Minimum cabling scenario PS6100 ...
Страница 133: ...March 2013 Dell EqualLogic Configuration Guide v14 1 13 124 Figure 44FS7610 network ...