CHAPTER 2
1U1N Configuration Equipment Installation
This section provides information for installation of the equipment used in a VxFlex
Ready Node PowerEdge 14G server 1U1N configuration.
l
Installation of the equipment in the cabinet
.......................................................20
l
Installation in cabinets with single-phase power distribution
.............................. 20
l
Installation in cabinets with 3-phase delta power distribution
.............................23
l
Installation in cabinets with 3-phase wye power distribution
.............................. 27
l
Identifying the kit components
........................................................................... 31
l
.................................................................................................... 33
l
Secure the rail assemblies to the cabinet
........................................................... 34
l
Install the system in the cabinet
.........................................................................35
l
......................................................................................... 37
l
Connect and route cords and cables
.................................................................. 38
1U1N Configuration Equipment Installation
19
Содержание EMC VxFlex Ready Node 14G
Страница 1: ...Dell EMC VxFlex Ready Node 14G Hardware Installation Guide 302 004 321 REV 03 ...
Страница 6: ...FIGURES 6 Hardware Installation Guide ...
Страница 8: ...TABLES 8 Hardware Installation Guide ...
Страница 16: ...Before You Begin 16 Hardware Installation Guide ...
Страница 18: ...1U1N Procedures 18 Hardware Installation Guide ...
Страница 40: ...1U1N Configuration Equipment Installation 40 Hardware Installation Guide ...
Страница 48: ...Install AC Power Cables 48 Hardware Installation Guide ...
Страница 62: ...2U1N Procedures 62 Hardware Installation Guide ...
Страница 74: ...2U1N Configuration Equipment Installation 74 Hardware Installation Guide ...