
10. Repeat steps
on page 69 -
on page 69 for each ScaleIO Ready Node server
needing the BIOS and firmware updates and configuration. All servers can be
updated in parallel.
11. Wait for the configuration and firmware updates to complete. The server
console screen will indicate when the script is complete.
WARNING
Do not reboot the ScaleIO Ready Node server while the update process is
being performed!
The iDRAC will be reset several times during the update process. This causes
the iDRAC virtual console viewer to close, virtual media to disconnect, and the
iDRAC browser window to be unavailable for several minutes during each reset.
The hardware update scripts will continue to run from RAM on the server.
The update script will generate a log indicating whether each configuration and
firmware flash is successful.
12. (Optional) Check each ScaleIO Ready Node server's log for successful
competition:
a. Connect to the iDRAC KVM console screen.
b. After the update script completes, press Alt+F2 to access a user console,
and then Enter to log in.
c. Check the log contents for errors:
less /bundleapplicationlogs/apply_components.log
For more information, see
Troubleshooting the Hardware ISO
on page 73 .
d. Press q to exit the log viewer, and then Alt+F1 to access the original console
screen.
13. Reboot the servers and allow the update and configuration jobs to complete.
You can do this remotely using RACADM (see Step
from the server console screen.
14. For each server, check the iDRAC job queue to verify that the iDRAC jobs
created by the bootable ISO have completed successfully:
racadm -r
<dracIP>
-u root -p
<password>
jobqueue view
Any job failures may require running the bootable ISO again, or further
troubleshooting.
15. For each server, after the hardware updates are finalized, clean up the iDRAC
job queue:
racadm -r
<dracIP>
-u root -p
<password>
jobqueue delete --all
16. Continue with OS installation and configuration, ScaleIO deployment, and other
required tasks.
Reference Material
70
Hardware Configuration and Operating System Installation Guide - ESXi Servers
Содержание EMC ScaleIO Ready Node 14G
Страница 6: ...FIGURES 6 Hardware Configuration and Operating System Installation Guide ESXi Servers ...
Страница 8: ...TABLES 8 Hardware Configuration and Operating System Installation Guide ESXi Servers ...
Страница 34: ...Installing the Operating System 34 Hardware Configuration and Operating System Installation Guide ESXi Servers ...
Страница 54: ...Port Configuration 54 Hardware Configuration and Operating System Installation Guide ESXi Servers ...
Страница 78: ...Index 78 Hardware Configuration and Operating System Installation Guide ESXi Servers ...