70
Dell EMC Connectrix EC-1700 Cabinet Installation and Setup Manual
Installing Directors into the EC-1700 Cabinet
IMPORTANT
Do not remove this upper 14 U air baffle when there is only one
MDS 9513 or 9509 director installed in the lower position in the
EC-1700-C. Doing so will seriously comprise the airflow
characteristics and cooling capabilities of the EC-1700-C.
Installing second
(upper) MDS director
From the factory the upper left shelf bracket is not installed. This is
because the upper 14 U air baffle is occupying this space.
IMPORTANT
When installing a MDS 9710 director in the upper location in the
EC-1700-C remove the upper 14 U air baffle from the left side
vertical NEMA mounting rails before installing the MDS 9710 or
9509 director.
Failure to remove the upper 14 U air baffle when installing a MDS
9710 or 9706 director in the upper location in the EC-1700-C cabinet
will cause the upper MDS director to overheat and eventually fail
and/or shutdown.
To install an MDS director in the upper position, you will first need to
remove the 14 U baffle from the left side vertical mounting rails.
Remove the screws from the front and rear of the 14 U baffle.
shows the removal of the 14U baffle.
Содержание EMC Connectrix EC-1700 Series
Страница 8: ...Dell EMC Connectrix EC 1700 Cabinet Installation and Setup Manual 8 Figures ...
Страница 22: ...22 Dell EMC Connectrix EC 1700 Cabinet Installation and Setup Manual EC 1700 Cabinet Overview ...
Страница 28: ...28 Dell EMC Connectrix EC 1700 Cabinet Installation and Setup Manual EC 1700 Cabinet Specifications ...
Страница 110: ...110 Dell EMC Connectrix EC 1700 Cabinet Installation and Setup Manual Installing Directors into the EC 1700 Cabinet ...