Figure 11. Edge 600 series DC power connection port
2. Connect the power adapter to the AC power outlet. When the Edge powers ON, verify that the status LED on the front of
the Edge system is on.
NOTE:
Connect the device to a properly wired earth-ground AC power outlet.
3. Connect one of the default WAN ports (SFP1,SFP2 or GE3, GE4, GE5, or GE6) to an available Internet connection.
NOTE:
SFP modules are not included.
Figure 12. Edge 600 series SFP/SFP+ ports, and ports GE3 through GE6
a. SFP/SFP+ ports 1 and 2
b. Default WAN ports GE3 through GE6
NOTE:
By default, the Edge gets a DHCP IP address from the ISP on the WAN uplink. When the WAN connection is
fully operational, the LED on the front of the Edge system is dark green.
4. If you received an email from your IT administrator, follow the instructions in the email to complete the Edge activation.
If you did not receive an email, request the setup instructions for your IT administrator or contact your Dell EMC sales
representative.
Figure 13. Example email from Administrator
5. Connect local devices such as computers and switches to default LAN ports GE1 or GE2, or through the Edge Wi-Fi.
20
Edge 600 Series installation