Table 14. DD9300 with DS60 DD Cloud Tier or HA and DD Cloud Tier primary node cabling
instructions (continued)
String
(Loop)
I/O - Port
Shelf Port
Length
2
I/O 2 - Port 1
B controller port 0 of the highest number shelf in V2
2M
3
I/O 7 - Port 2
A controller port 0 of shelf V3.1
2M
3
I/O 2 - Port 2
B controller port 0 of the highest number shelf in V3
5M
4
I/O 7 - Port 3
A controller HOST
port of the SSD shelf
2M
4
I/O 2 - Port 3
B controller HOST
port of the SSD shelf
2M
a.
Cable lengths shown are designed for Data Domain racks. Longer cables (up to 5M) can be used.
Table 15. DD9300 with DS60 DHA and DD Cloud Tier standby node cabling instructions
String
(Loop)
I/O - Port
Shelf Port
Length
1
I/O 7 - Port 0
B controller port 2 of shelf V1.1
2M
1
I/O 2 - Port 0
A controller port 2 of the highest number shelf in V1
2M
2
I/O 7 - Port 1
B controller port 2 of shelf V2.1
2M
2
I/O 2 - Port 1
A controller port 2 of the highest number shelf in V2
2M
3
I/O 7 - Port 2
B controller port 2 of shelf V3.1
2M
3
I/O 2 - Port 2
A controller port 2 of the highest number shelf in V3
5M
4
I/O 7 - Port 3
A controller EXPANSION
port of the SSD shelf
2M
4
I/O 2 - Port 3
B controller EXPANSION
port of the SSD shelf
2M
a.
Cable lengths shown are designed for Data Domain racks. Longer cables (up to 5M) can be used.
58
Connect Cables and Power On