background image

Spa Eclipse 

Installation & Operations Manual

2

c. Install the check valve in the tubing above the water line. Ensure 

flow direction is from the Spa Eclipse to the vacuum source.

d. Secure all tubing connections with hose clamps. 

4.  Electrical

a. Verify that there is no power to the spa and connect the Spa 

Eclipse cord into the mating connector(s) on the spa control box.

b. Where possible, route the Spa Eclipse power cord away from 

other electrical lines. Avoid routing the power cord parallel to 
any low-voltage signal wires.

5.  Operation

a. With the spa filled to the proper level, run the spa controller 

through several cycles.
i.  Verify that the green light on the Spa Eclipse turns on and off 

as required by the controller.

ii. Verify that gas is flowing into the injector (there should be no 

water in the tubing and very small bubbles at the return).

iii. Verify that water does not push past the check valve during 

any spa cycle.

iv. Check for and correct any leaks in the ozone tubing.

6.    System Maintenance

a. Ordering Information:  

To locate the dealer nearest you call 1.800.676.1335 ext. 232 
 
Be prepared with the following information: 
• Name  

• Date Purchased 

• Address 

• Dealer Name 

• Model # 

b. Standard Replacement Parts List:

i.  Ozone Check Valve ..............................................7-1140-01
ii. Ozone Tubing .......................................................7-0075 
iii. Inlet Filter Assembly .............................................9-0858-01 

  The Ozone Check Valve (Item i) should be replaced annually.

c. Regularly inspect ozone supply tubing for cracks or wear. 

Also check to make sure no water is present between the 

Отзывы: