10
MAINTENANCE INSTRUCTION
In diagram "A" the maintenance to be done is indicated with the respective intervals to protect the machine.
Not following the scheduled intervals can compromise the functionality of the machine and result in the
warranty being invalidated.
DIAGRAM “A” SCHEDULED MAINTENANCE
FIRST START
DAILY
EACH 150 HOURS
OR
EACH MONTH
EACH 1200 HOURS
OR
EACH YEAR
SAFETY STICKER
Check presence
Check presence
Check presence
Check presence
DRIVE LEVERS
Check automatic
return
Check automatic
return
Check automatic
return
Check automatic
return
TUBING
Check tightness
Check tightness
Check tightness
Check tightness
OIL IN THE TANK
Check level
Check level
Check level
Substitute
OIL FILTER
Substitute
OIL IN THE
MULTIPLIER
Check level
Check level
Check level
Substitute
COTTER PINS
Check presence
Check presence
Check presence
Check presence
BOLTS *
Check tightness
Check tightness
Check tightness
Check tightness
GREASING
Grease
Grease
Grease
Grease
* Do not over tighten pins with self locking nuts to prevent the joint from
blocking.
Содержание RES
Страница 17: ...17 SPARE PARTS OPTIONS...
Страница 18: ...18 MAIN FRAME RES 10...
Страница 19: ...19 MAIN FRAME RES 15 20...
Страница 20: ...20 MAIN FRAME RES 30...
Страница 21: ...21 ROTATION GROUP RES 15 20...
Страница 22: ...22 ROTATION GROUP RES 30...
Страница 23: ...23 ARMS RES 10...
Страница 24: ...24 ARMS RES 15...
Страница 25: ...25 ARMS RES 20...
Страница 26: ...26 ARMS RES 30...
Страница 27: ...27 HYDRAULIC SYSTEM RES 10...
Страница 28: ...28 HYDRAULIC SYSTEM RES 15...
Страница 29: ...29 HYDRAULIC SYSTEM RES 20...
Страница 30: ...30 HYDRAULIC SYSTEM RES 30...
Страница 31: ...31 RES 50 SUMMARY TABLE...
Страница 32: ...32 RES 50 TABLE 20...
Страница 33: ...33 RES 50 TABLE 40...
Страница 34: ...34 RES 50 TABLE 30...
Страница 35: ...35 RES 50 TABLE 10...
Страница 36: ...36 RES 50 TABLE 50...
Страница 37: ...37 RES 50 TABLE 100...