DEKKER Vacuum Technologies, Inc. – HullVac / September 2016
19
SHUT DOWN PROCEDURE
1.
Close the system inlet isolation valve.
2.
Switch control power to OFF.
3
Open the gas ballast valves to vent the
pump to atmosphere. If system is
equipped with an automatic vent valve or
an anti-suckback valve, no action is
needed. Failure to vent the pump to
atmosphere may cause oil to fill into the
pumping chamber and travel back through
the inlet manifold into the vacuum process
chamber.
4
If water cooled, turn off the cooling water
supply.