background image

 

Management Procedure 2585 Rev. F 

3

Table 2-2 Minimum Use Specification 

Model Range

Accuracy

 

UTG, UTG-STD, UTG-C 

UTG-CA, UTG-CLF, UTG-CX 

1.0 - 125 mm 

(0.040 - 5.000”)

± 0.008 mm 

(± 0.00025”) 

UTG-M & UTG-ME 

2.5 - 125 mm 

(0.100 - 5.000”) 

± 0.008 mm 

(± 0.00025”) 

UTG-P 

0.200 – 12.000 mm 

(0.008 – 0.472”) 

± 0.003 mm 

(± 0.0001”) 

 

Table 2-3 Actual Equipment Specification 

UUC Model 

Equipment 

Generic Name

Actual Equipment Specifications 

Manufacturer &  

Model Applicable 

Range       

Accuracy 

UTG, UTG-STD, UTG-C 

UTG-CA, UTG-CLF, 

UTG-CX, UTG-M & 

UTG-ME 

Step Blocks 

2.50 - 12.50 mm 

(0.100 - 0.500”) 

± 0.005 mm 

(± 0.00020”)

 

PH Tool Custom 

5 Step Block 

UTG-P Step 

Blocks 

0.50 - 2.50 mm 

(0.020 – 0.098”) 

± 0.005 mm 

(± 0.00020”) 

PH Tool Custom 

5 Step Block 

 

Caution:

 The instructions in this Calibration Procedure relate specifically to the equipment and 

conditions listed in this section. If other equipment is substituted, the information and 
instructions must be interpreted accordingly. 
 

Table 2-4 Calibration Environmental and Warm Up Requirements 

Measurement Standards & Support Equipment 

Environmental Requirements: 

Temperature: 23 ± 5

°

 C. 

Relative Humidity:  Less than 95%

Measurement Standards & Support Equipment 

Warm-up and Stabilization Requirements: 

None 

 

3

 

Preliminary Operations

 

 

Note

: Review the entire document before starting the calibration process. 

 
3.1

 

Visual Inspection 

 
3.1.1

 

Visually inspect the UUC for:   

 

Probe tip wear or damage 

 

Other damage or wear 

 

Proper identification 

 
3.1.2

 

Damage or excess wear shall be repaired prior to beginning the calibration process. 

 
3.2

 

Gage Reset 

 

Содержание PosiTector Series

Страница 1: ...e Requirements 2 Table 1 1 Measurement Ranges 2 2 Measurement Standards and Support Equipment Performance Requirements 2 Table 2 1 UUC Accuracy Requirements and Description 2 Table 2 2 Minimum Use Specification 3 Table 2 3 Actual Equipment Specification 3 Table 2 4 Calibration Environmental and Warm Up Requirements 3 3 Preliminary Operations 3 4 Calibration Process 4 5 Performance Requirements 5 T...

Страница 2: ...bration 2 Measurement Standards and Support Equipment Performance Requirements 2 1 The UUC accuracy requirements are based upon the published UUC performance specifications 2 2 Minimum Use Specifications are the minimum test equipment specifications required to meet all the UUC accuracy requirements and the test uncertainty ratio applied 2 3 The uncertainty ratio applied in this Calibration Proced...

Страница 3: ...tom 5 Step Block Caution The instructions in this Calibration Procedure relate specifically to the equipment and conditions listed in this section If other equipment is substituted the information and instructions must be interpreted accordingly Table 2 4 Calibration Environmental and Warm Up Requirements Measurement Standards Support Equipment Environmental Requirements Temperature 23 5 C Relativ...

Страница 4: ...screen prompt After zeroing verify the probe on the thinnest and thickest steps of the appropriate 5 step block Allowable tolerances following zeroing are 0 05 mm 0 002 4 Calibration Process Note Whenever the test requirement is not met verify the results of each test and take corrective action before proceeding 4 1 Review the Performance Requirements Table 5 1 4 2 Select the 2 Pt Adjust feature f...

Страница 5: ...e 5 1 Performance Requirements and Calibration Data for PosiTector UTG Reference Thickness mm Min Reading Allowedn mm Max Reading AllowedY mm Actual Gage Measurement mm A B For imperial metric readings convert using 1 25 4 mm n For UTG P Calculation A 0 010 mm For all other probes Calculation A 0 03 mm Y For UTG P Calculation A 0 010 mm For all other probes Calculation A 0 03 mm ...

Страница 6: ... C UTG CA UTG CLF UTG CX UTG M UTG ME UTG P Reason for Change New products Description of Change Updated Table 1 1 Retitled and updated tables 2 1 2 2 2 3 Re wrote section 2 Re wrote Sections 1 1 and 3 2 2 Added section 3 2 3 Updated calculations in table 5 I confirm I have read and understand the procedure and the change described above Printed Name Signature Date Management Form 0010 02 05 1998 ...

Отзывы: