
58
GT 530A
DDR_G30A/AE _IO_V4.0 09/2013
57. Installing the side covers
2
1
3
C
A
B
3
A
Package FA17 to FA24
B
Package MR246
C
Package FA16
1. Position the rear plate, which is 47
1/4
/1200 mm long. Attach 2 screws H8 x 30 and serrated washers.
2. Position the front plate with the round holes towards the front of the boiler. Attach 4 screws H8 x 30 and serrated
washers.
3. Attach the joining plate with the round holes towards the front of the boiler with 4 tapping screws and serrated washers.
GT 530A-18 to Gt 530A-25
As Set up
55. Installing the sweeping cover insulation (FA35 to FA41)
Put in place the sweeping cover insulation
- GT 530A-15 to GT 530A-17 : 2 pieces.
- GT 530A-18 to GT 530A-25 : 4 pieces.
Содержание GT 530A Series
Страница 81: ...79 GT 530A DDR_G30A AE _IO_V4 0 09 2013 Insulation 71 70...
Страница 83: ...81 GT 530A DDR_G30A AE _IO_V4 0 09 2013...