DeDietrich GT 210 A Скачать руководство пользователя страница 1

GT 210 A

Oil-Gas Fired Hot Water Boiler                                                                              

English

11/03/09

Warning:

Before putting the boiler into operation read this manual

carefully.

Warning:

The operating manual is part of the documentation that is

delivered to the installation’s operator. Go through the

information in this manual with the owner/operator and

make sure that he or she is familiar with all the necessary

operating instructions.

Notice:

This manual must be retained for future reference. Improper

installation, adjustment, alteration, service or maintenance can

cause injury, loss of life or property damage. Refer to this

manual. For assistance or additional information consult a

qualified installer, service agency or the fuel supplier.

              

Installation & Operating Manual

 

Please Read & Save this Manual for Future Reference

 

 

8227-4096-F 

8227-4096-F 

Содержание GT 210 A

Страница 1: ...perator and make sure that he or she is familiar with all the necessary operating instructions Notice This manual must be retained for future reference Improper installation adjustment alteration service or maintenance can cause injury loss of life or property damage Refer to this manual For assistance or additional information consult a qualified installer service agency or the fuel supplier Inst...

Страница 2: ...Do not store or use gasoline or other flammable liquids in the vicinity of this or any other appliance WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electric switch do not use any phone in your building Immediately call your gas supplier from a neighbor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the Fire Department Ins...

Страница 3: ...er connection 8 Assembly 9 Chimney connection 24 1 Flue size 24 2 Connecting to the flue 24 Connecting the burner 24 Electrical connections 25 Maintenance 25 1 Boiler 25 2 Domestic hot water GT 2100 26 3 Precautions required in the case of long boiler stops one or more years 26 4 Precautions required if the heating is stopped when there is a risk of freezing 26 5 Identification plate 26 Spare part...

Страница 4: ...ng must be carried out at least once a year by a trained service technician The entire installation must be tested for proper operation Any defects detected must be fixed immediately General 1 Uncrating Upon arrival check shipment to ensure all parts have been shipped Inspect all items for delivery damage Report all damage and short ages to the delivery carrier Report any damage and shortages to t...

Страница 5: ... 0 365 0 596 0 887 1 23 1 51 36 F Ft H2O 0 204 0 335 0 498 0 693 0 85 Combustion chamber Dimensions Diameter equivalent Inch 12 17 mm 309 Depth Inch 17 6 22 6 27 6 32 6 37 6 mm 446 573 700 827 954 Volume ft3 1 1653 1 4831 1 8009 2 1188 2 4366 m3 0 033 0 042 0 051 0 060 0 069 MAWP Water PSI ASME IV Rating Class 30 60 PSI See Canadian Provincial CRN approvals Min Safety Relief Capacity MBH 147 190 2...

Страница 6: ...25 Bolt diameter threading predrilled additional marking 6 inch for larger mounting requirements 4 5 Combustion head Ø 4 7 16 inch precut additional marking 5 1 8 inch for larger combustion heads Supply manifold port for safety relief valve Supply manifold inch port for temperature and pressure gauge Drain port inch 1 A Dimension will increase with applied burner consult supplied burner documentat...

Страница 7: ...tion are required for the boiler inadequate combustion air or makeup air provisions may result in foul boiler room odors incomplete combustion resulting in carbon monoxide CO development or creation of negative building pressure Particular attention must be observed if the boiler is operating near or within vicinity of beauty shops paint shops or industrial plant where known pollutants corrosive e...

Страница 8: ...ed in or close to rooms in which the atmosphere is polluted with chlorine or fluorine compounds may be subject to high corrosion For example hairdressing salons industrial premises solvents cooling equipment etc Boilers installed in such locations shall not be covered by the warranty 3 Levelling Level as shown in the drawing by means of the four adjustable feet supplied in the bag of fasteners of ...

Страница 9: ...cation which avoid accumulation of snow or debris that could block the vent terminal Consult local codes regarding other requirements for the location and installation of the vent terminal Co Venting with other appliances must be sized and installed according to CSA B149 ANSI Z223 1 Any improper operation of venting system must be corrected and resized according to the tables in part II of nationa...

Страница 10: ...Category 4 Definitions Cat I A Boiler which operates with a non positive vent breech pressure and flue gas temperatures which avoids excessive condensation production in the chamber and venting Cat II A Boiler which operates with a non positive vent breech pressure and flue gas temperatures produce condensation production in the chamber and venting Cat III A Boiler which operates with a positive v...

Страница 11: ... 6 Condensate TEE fitting supplied on the boiler breeching as close as possible and be orientated to avoid accumulation of flue gas condensation in the boiler or venting is also used to determine flue gas emissions Category II Vent Systems Requirements 1 Flue gas temperatures below the green line shown in chart A 2 Approved type of venting for category II appliances 3 A barometric draft control ma...

Страница 12: ...des or by good engineering methods 4 Vent safety device equipped on burner MR 5 Condensate TEE fitting supplied on the boiler breeching as close as possible and be orientated to avoid accumulation of flue gas condensation in the boiler or venting Category IV Vent Systems Requirements 1 Flue gas temperatures below the green line shown in chart A 2 Approved type of venting for category IV appliances...

Страница 13: ...afe efficient and trouble free operation System Requirements 1 Venting sized accordance to direct vent table 2 Type BH AL294C vent material 3 Condensate TEE fitting supplied on the boiler breeching as close as possible and be orientated to avoid accumulation of flue gas condensation in the boiler or venting is also used for determining flue gas emissions 4 Vent termination TEE 5 Vent safety device...

Страница 14: ...ondensation developed will drain through the condensate TEE fitting Vent safety device differential air pressure switch manual reset NC switch opens on rise of pressure Optional function of power burners which can employ an post purge function to exhaust flue gases for a fixed time 1 minute to 4 minutes maximum Burner employing a standby air damper closed position the closed position should be sli...

Страница 15: ...ess than 7 ft any paved sidewalk or drive way Less than 6 ft from an open able window door or mechanical combustion air supply Less than 6 ft of any combustion air inlet Less than 3 ft of the vertical centerline of the meter regulator assembly on a horizontal plane perpendicular to the regulator Less than 6 ft of gas service regulator vent outlet Less than 4 ft of oil tank vent or oil tank fill in...

Страница 16: ...rwise look for the leak and repair it immediately The operations described below shall only be performed with the boiler and power supply off To have access to the exchange surfaces take off the front of the casing open the door by unscrewing the two flanged nuts 17 mm wrench remove the convection accelerators in the flues of the boiler with the supplied removal hook carefully sweep the flues with...

Страница 17: ...y dosed antifreeze agent to prevent to the heating circuit from freezing If this cannot be done drain the system completely Drain the hot water tank and piping as well 5 Boiler Rating Approval Label The identification plate fixed on the side of the boiler during installation is used to identify the boiler correctly It also provides the main specifications of the boiler The serial number breakdown ...

Страница 18: ...dering spare parts do not forget to state the code number given opposite the description of the required part in the liste BOILER BODY 10 9 11 24 23 25 31 6 1 4 2 4 3 17 7 5 19 17 18 26 27 27 20 21 22 29 30 11 14 13 15 16 12 11 4x 1x 4x 2x 2x 2x 2x 2x 7 26 27 27 28 32 8 8 8227N154 ...

Страница 19: ...36 GT 210 A 21 08 06 94863106 82274096E CASING INSULATION 44 43 40 41 47 46 48 40 41 45 39 49 38 8227N062A 2X 18X 3X 4X 4X 2X 2X 18X 2X 4X 2X 1X 5m ...

Страница 20: ...27 Coating material for nipple 300 g 29 9696 0225 305 16 long brush 29 9696 0226 471 4 long brush 30 8227 8502 Bag of fasteners for body 31 9602 0671 Hook for baffles 32 9434 5102 Retouching spray paint anthracite grey 32 9434 5104 Retouching spray paint ivory INSULATING MATERIAL 38 8227 5512 Complete body insulation 4 sections 38 8227 5513 Complete body insulation 5 sections 38 8227 5514 Complete...

Страница 21: ...C safety thermostat 69 8500 0002 30 90 C setting thermostat 70 8218 8973 Setting buttons pins 71 8536 5155 GM flat thermometer 72 8199 4906 CP electrical circuit 73 8227 4908 Sensor wiring 74 8199 8984 Fasteners accessories for control panel 75 9536 2632 Hour run meter 100 130V Ref Code no DESCRIPTION ...

Страница 22: ...ario N3E 1A3 CANADA Tel 519 650 0420 Fax 519 650 1709 In USA or South America 1054 North DuPage Avenue Lombard Illinois USA 60148 Tel 630 953 2374 Fax 630 953 2376 Toll Free 1 800 943 6275 www dedietrichboilers com In the interest of customers DE DIETRICH DDR Americas are continuously endeavouring to make improvements in product quality All the specifications stated in this document are therefore ...

Отзывы: