DeDietrich CBB 20 Скачать руководство пользователя страница 3

3

15/09/2008 - 300008541-001-E

CBB

2. 

Important recommendations

Congratulations on your choice of a high quality product. We strongly advise you to read the following instructions in order to
guarantee the optimal operation of your appliance. We are sure that it will be entirely to your satisfaction and will meet with all of
your expectations.

1 Symbols used

Caution danger
Risk of injury and damage to equipment. Attention must be
paid to the warnings on safety of persons and equipment.

Specific information
Information must be kept in mind to maintain comfort.

Z

Reference

Refer to another manual or other pages in this instruction
manual.

2 Important recommendations

For a proper operating of the boiler, follow carefully the
instructions.

Any intervention on the appliance and heating equipment
must be carried out by a qualified technician.

The manufacturer is not liable for any improper use of the
appliance or failure to maintain or install the unit correctly
(the user shall take care to ensure that the system is
installed by a qualified fitter).

Keep children away from the boiler.

Incorrect use or unauthorised modifications to the
installation or the equipment itself invalidate any right to
claim.

Keep to the polarity shown on the terminals : phase (L),
neutral (N) and earth 

4

.

In the event of a power cut:
- Do not add any fuel.

Check regularly that the installation contains water and is
pressurised.

Keep the boiler doors closed during operation.

Open the boiler doors only during commissioning and
when adding fuel.

Do not burn unsuitable fuel.

2.1 Aeration

Position the air inlets in relation to the high ventilation vents in order
that the air is refreshed throughout the boiler room.
The minimum cross-sections and the positions of the fresh air inlet
and the air outlet must comply with prevailing regulations.

Do not obstruct the air inlets in the room (even partially).

Caution:

In order to avoid damage to the boiler, it is necessary to prevent the
contamination of combustion air by chlorine and/or fluoride
compounds, which are particularly corrosive. These compounds are
present, for example, in aerosol sprays, paints, solvents, cleaning
products, washing products, detergents, glues, snow clearing salts,
etc. Therefore:

- Do not suck in air evacuated from premises using such products:

hairdressing salons, dry cleaners, industrial premises (solvents),
premises containing refrigeration systems (risk of refrigerant
leakage), etc.

- Do not stock such products close to the boilers.

If the boiler and/or peripheral equipment are corroded by such
chloride or fluoride compounds, the contractual guarantee
cannot be applied

.

Содержание CBB 20

Страница 1: ...CBB Wood burning boiler User Guide 300008541 001 E EN...

Страница 2: ...nd ignition 9 4 1 Commissioning 9 4 2 Ignition CBB 20 10 4 3 Adding more logs CBB 20 10 4 4 Ignition CBB 30 11 4 5 Adding more logs CBB 30 11 5 Cleaning and regular servicing 12 5 1 CBB 20 Cleaning th...

Страница 3: ...aim Keep to the polarity shown on the terminals phase L neutral N and earth 4 In the event of a power cut Do not add any fuel Check regularly that the installation contains water and is pressurised Ke...

Страница 4: ...can be used Dry wood stored under cover for at least 2 years with a low humidity level less than 20 of the gross mass Logs with a maximum diameter of 150 mm Maximum length of the logs For improved co...

Страница 5: ...into the boiler Logs The natural energy of wood is converted into heat by combustion in the Bioenergy boiler Buffer tank Used for storing hot water extracted from the biofuel boiler max 85 C Compensa...

Страница 6: ...ure whatever the outside temperature This is done by mixing the outlet water with the colder heating return water Pressure gauge Indicates the pressure in the heating circuit Air vent Ensures that the...

Страница 7: ...al handle 5 Inspection hatch Ashtray 6 Air regulator flap 7 Air regulator flap chain 8 CBB 20 Draught moderator setting CBB 30 Smoke nozzle 9 Output modulator 10 Safety exchanger To be connected by th...

Страница 8: ...5 09 2008 300008541 001 E 3 Description 3 4 Control panel 14 General ON 1 OFF 0 switch DHW pump 15 Boiler thermometer 16 Storage tank load pump thermostat And or return temperature elevating A000231 1...

Страница 9: ...in the installation Top up with more water if necessary 3 Carry out the boiler ignition operations See chapter Ignition CBB 20 4 Set the output modulator to 80 C 5 Open the air regulator flap by tensi...

Страница 10: ...o escape Put in logs and light 4 Close the loading door 5 When the wood is well lit about 20 30 minutes later continue to fill the combustion chamber Close the loading door 4 3 Adding more logs CBB 20...

Страница 11: ...cape Put in logs and light 5 Close the loading door 6 When the wood is well lit about 20 30 minutes later continue to fill the combustion chamber Close the loading door 7 Push the smoke extraction han...

Страница 12: ...g season have the boiler thoroughly cleaned by a qualified professional Turn the boiler off before cleaning See chapter Stopping the boiler 5 1 CBB 20 Cleaning the boiler Every 3 to 7 days Open the lo...

Страница 13: ...ry 3 to 7 days Open the loading door Sweep the ashes through the slit in the bottom of the combustion chamber Work the ash removal handle so as to make the ashes fall into the ashtray Open the lower i...

Страница 14: ...en the inspection hatch and clean using a brush CBB 30 Pull out the holding levers Pull out the plate and baffle unit Clean with a brush Put the plate and baffle unit back in place 5 4 Checking the do...

Страница 15: ...ing surfaces in the boiler Precautions to take if there is a danger of frost Heating circuit Use a correctly dosed antifreeze to prevent the heating water freezing If this cannot be done drain the sys...

Страница 16: ...ating outlet and return valves are closed Open valves Boiler fitted with a control unit The control unit is not correctly set Check the settings See Control unit instructions The boiler thermostat and...

Страница 17: ...manufacturer s instructions in particular those relating to the regular maintenance of the unit the rules of the profession The warranty is limited to the exchange or repair of such parts as have bee...

Страница 18: ...18 CBB 15 09 2008 300008541 001 E 7 Troubleshooting...

Страница 19: ...19 15 09 2008 300008541 001 E CBB 7 Troubleshooting...

Страница 20: ...D 48282 EMSDETTEN 49 0 25 72 23 5 49 0 25 72 23 102 info dedietrich de Weggevoerdenlaan 5 B 8500 KORTRIJK 32 0 56 23 75 11 Bahnstrasse 24 CH 8603 SCHWERZENBACH 41 0 44 806 44 24 41 0 44 806 44 25 39 r...

Отзывы: