Guide book
D 3000 / 4000 / 5000
Seite 21
3.3.5 Shower
The switch shower in the technical room switches the shower water pump ready for use.
The shower procedure can only be started and stopped via the switch „Shower procedure
Start“.
3.3.6 Sewage water filtering plant (optional equipment)
If the switch „Sewage water filtering plant“ is switched on in the technical room, the
sewage pump starts automatically if you switch the switch „shower water start“ and
pumps the dirty shower water via 2 steps filtering plant. The filtered sewage water comes
out at the connection „filtered sewage water“.
Shower procedure start
Shower
Sewage water plant
filtered sewage water
Содержание decontamination mobile D 3000
Страница 39: ...Guide book D 3000 4000 5000 Seite 39 6 2 Circuit vehicle lighting for all versions identical...
Страница 41: ...Guide book D 3000 4000 5000 Seite 41 6 4 Circuits vehicle technology Electric Version...
Страница 42: ...Guide book D 3000 4000 5000 Seite 42...
Страница 43: ...Guide book D 3000 4000 5000 Seite 43 6 5 Circuits vehicle technology Electric Version with forced locking...
Страница 44: ...Guide book D 3000 4000 5000 Seite 44...
Страница 45: ...Guide book D 3000 4000 5000 Seite 45...
Страница 46: ...Guide book D 3000 4000 5000 Seite 46 6 6 Circuits vehicle technology Diesel Version...
Страница 47: ...Guide book D 3000 4000 5000 Seite 47...
Страница 48: ...Guide book D 3000 4000 5000 Seite 48 6 7 Circuits vehicle technology Gas Version...
Страница 49: ...Guide book D 3000 4000 5000 Seite 49...