Instruction manual
Water treatment boiler system C 130 L
page 8
Unplug unit
Connect hoses:
o
Optionally connect „water inlet“ with pipeline system or fill tank via filling
opening by hand
o
Connect „warm water shower water“ with shower roof
o
Connect „Sewage IN“ with shower floor
o
Connect „Sewage OUT“ with sewerage
Fill sewage pump with water
Fill filter housing of 220µ filter with water
Tighten cap nut of filter housing hand-tight
Connect to power
Set temperature of thermostat (red pointer) to max. 40°C. The temperature can be
checked on the temperature gauge (black pointer).
Turn Switch automatic operation to „1“.
The unit is now ready-to-operate
In operation mode condensation water may emerge from „overflow“. Do not close
overflow. If water drips, put a bucket underneath.
Thermostat
Control lamp tank empty
Control lamp heating
Button sewage pump start
Control lamp filling
Switch automatic operation