background image

 

Instruction manual 

 

Water treatment boiler system C 130 L 

 

 

 

 

 

page 10 

 

  Set temperature of thermostat (red pointer) to max. 40°C. The temperature can be 

controlled on the temperature gauge (black pointer). 

  Switch automatic operation to „Pump 1“ (if only one sewage pump is in use) or 

„Pump 1 + 2“ (if both pumps are in use). 

  the unit is now ready-to-operate 

 
 
 

 

 
 
 

  In operating status condensation water may leak out of “overflow“. Please do not 

close overlow. If it drips, put a bucket underneath. 

 
 

Thermostat

Control lamp tank empty

Control lamp heating

Button sewage pump Start

Control lamp filling

Switch automatic operation

Содержание C 130 L

Страница 1: ...Instruction manual Water treatment boiler system C 130 L Manufacturer deconta GmbH Im Geer 20 D 46419 Isselburg Description Water treatment system C 130 L Type 546 547 Serial No...

Страница 2: ...description 5 4 1 Intended use 5 4 2 Unit description 5 5 Technical data 6 6 Initial operation 7 6 1 Version with one Sewage pump 7 6 2 Version with two sewage pumps for 2nd shower 9 7 Maintenance an...

Страница 3: ...ent of non observance deconta assumes no liability To ensure safety during operation of the unit the following must be strictly observed Do not use in potentially explosive areas Necessary repairs and...

Страница 4: ...it cannot be guaranteed In winter and at risk of frost the whole unit Pump filter housing and tank needs to be emptied before transport Attention Transport of unit also relocation only when empty 2 3...

Страница 5: ...sed rooms you have to exclude that the asbestos fibres leave the sanitation area uncontrolled and endanger the human health and the environment For this reason personnel must leave the sanitation area...

Страница 6: ...ume Service Water 130 Litre Tank filling automatic or manual via filling opening Heat output 3000 W Filter stages 3 Filter sizes 10 Power outlet 230 V Power consumption 13 A Water connections System G...

Страница 7: ...the shaft The strong initial rotational resistance of the new pumps will come loose after running Safety instructions During works on the device always disconnect the plug Operate the device only wit...

Страница 8: ...ter housing of 220 filter with water Tighten cap nut of filter housing hand tight Connect to power Set temperature of thermostat red pointer to max 40 C The temperature can be checked on the temperatu...

Страница 9: ...esent o Connect Warm water Shower 2 with shower roof o Connect Cold water Shower 2 with cold water connection of shower roof if present o Connect Sewage IN 1 with shower floor o Connect Sewage IN 2 wi...

Страница 10: ...tch automatic operation to Pump 1 if only one sewage pump is in use or Pump 1 2 if both pumps are in use the unit is now ready to operate In operating status condensation water may leak out of overflo...

Страница 11: ...t Control of fine filter via manometer 7 2 Filter change The Manometer controls the fine filter We recommend a filter change at approx 3bar Attention Change Filter only when device is switched off Dem...

Страница 12: ...rst use Repairs and maintenance must only be executed under the observance of all relevant safety measures All the filters mentioned have to be disposed of according to the respective legal terms 7 3...

Страница 13: ...Instruction manual Water treatment boiler system C 130 L page 13 8 Circuit diagram 8 1 Version with one sewage pump...

Страница 14: ...Instruction manual Water treatment boiler system C 130 L page 14 8 2 Version with two sewage pumps...

Страница 15: ...Im Geer 20 D 46419 Isselburg Product Water management C 130 L Type 546 547 The design of the unit complies with EU Machine directive 2006 42 EG the following directives EU Low voltage directive 2006 9...

Отзывы: