10
.
WARNING
while installing, maintain a proper distance between the power cable conductors and the operator.
Program the control board to complete all adjustments. It is now possible to supply a complete installation in compliance with all
standards required for gate automation. See the instructions provided with the control panel to be connected.
Finally, verify that all adjustments operations have been correctly performed and that safety devices and unlocking device properly
work.
6 START-UP
The start-up phase is very important to ensure maximum security and compliance to regulations, including all the requirements of EN
12445 standard which establishes the test methods for testing the automation for gates.
DEA
System reminds that all installation, maintenance, cleaning or repair operations on any part of the system must be performed
exclusively by qualified personnel who must be responsible of all texts requie by the eventual risk;
6.1
The testing operation is essential in order to verify the correct installation of the system.
DEA
System wants to summarize the proper
testing of all the automation in 4 easy steps:
;
;
.
WARNING
Using spare parts not indicated by
DEA
System and/or incorrect re-assembly can create a risk to people, animals and
property and also damage the product. For this reason, always use only the parts indicated by
DEA
System and scrupulously follow all
assembly instructions.
6.2
In the event of malfunctions or simple power failure, release the motor (Pic. 8) and perform the operation manually.
The knowledge of the unlocking operation is very important, because in times of emergency the lack of timeliness in acting on such
a device can be dangerous.
WARNING
The efficancy and safety of manual operation of the automation is guaranteed by
DEA
System only if the installation has
been installed correctly and with original accessories.
7 MAINTENANCE
Good preventive maintenance and regular inspection ensure
long working life. In the table below you will find a listo f inspections/
maintenance operations to be programmed and executed periodi-
cally.
Consult the TROUBLE-SHOOTING” table whenever anomalies are
observed in order to find the solution to the problem and contact
DEA
System directly whenever the solution required is not provided.
INTERVENTION TYPE
PERIODICITY
cleaning of external surfaces
6 months
checking of screw tightening
6 months
checking of release mechanism operation
6 months
greasing of articulated joint
1 year
TROUBLE-SHOOTING
Description
Possible solutions
When the opening command is given, the leaf fails to move
and the operator’s electric motor fails to start.
The operator is not receiving correct power supply. Check all connections, fuses, and the
power supply cable conditions and replace or repair if necessary.
When the opening command is given, the motor starts but
the leaf fails to move.
Check that the unlocking system is closed (see Pic.8).
Make sure that the electronic device for electric power adjustment is in good condition.
If the piston remains at the complete end of its stroke when the gate is closed, review the
assembly procedure.
The operator jerks during movement.
The power of the gear motor may be insufficient for the characteristics of the gate’s wing;
check the choice of model whenever required.
The operator’s front and rear attachments bend or are not fastened correctly. Repair or
replace.
Содержание LOOK
Страница 1: ... Operating instructions move as you like www deasystem com ...
Страница 8: ...4 1 1 2 2 2 2 500 mm 250 mm 200 mm ...
Страница 10: ...D A C A Closing cycle Closing cycle Opening cycle Opening cycle ...
Страница 11: ...41 ...
Страница 12: ...42 APRE CHIUDE APRE CHIUDE COMUNE 4x1 mm 3x1 5 mm 24V 230V ...
Страница 14: ......