background image

10

.

WARNING

 while installing, maintain a proper distance between the power cable conductors and the operator.

Program the control board to complete all adjustments. It is now possible to supply a complete installation in compliance with all 

standards required for gate automation. See the instructions provided with the control panel to be connected.

Finally, verify that all adjustments operations have been correctly performed and that safety devices and unlocking device properly 

work.

6  START-UP

The start-up phase is very important to ensure maximum security and compliance to regulations, including all the requirements of EN 

12445 standard which establishes the test methods for testing the automation for gates.

DEA

 System reminds that all installation, maintenance, cleaning or repair operations on any part of the system must be performed 

exclusively by qualified personnel who must be responsible of all texts requie by the eventual risk;

6.1 

The testing operation is essential in order to verify the correct installation of the system. 

DEA

 System wants to summarize the proper 

testing of all the automation in 4 easy steps:

;

;

.

WARNING  

Using spare parts not indicated by 

DEA

 System and/or incorrect re-assembly can create a risk to people, animals and 

property and also damage the product. For this reason, always use only the parts indicated by 

DEA

 System and scrupulously follow all 

assembly instructions.

6.2 

In the event of malfunctions or simple power failure, release the motor (Pic. 8) and perform the operation manually. 

The knowledge of the unlocking operation is very important, because in times of emergency the lack of timeliness in acting on such 

a device can be dangerous.

WARNING

  The efficancy and safety of manual operation of the automation is guaranteed by 

DEA

 System only if the installation has 

been installed correctly and with original accessories.

7  MAINTENANCE

Good  preventive  maintenance  and  regular  inspection  ensure 

long working life. In the table below you will find a listo f inspections/

maintenance operations to be programmed and executed periodi-

cally.

Consult the TROUBLE-SHOOTING” table whenever anomalies are 

observed in order to find the solution to the problem and contact 

DEA

 System directly whenever the solution required is not provided.

INTERVENTION TYPE

PERIODICITY

cleaning of external surfaces

6 months

checking of screw tightening

6 months

checking of release mechanism operation

6 months

greasing of articulated joint

1 year

TROUBLE-SHOOTING

Description

Possible solutions

When the opening command is given, the leaf fails to move 

and the operator’s electric motor fails to start.

The operator is not receiving correct power supply. Check all connections, fuses, and the 

power supply cable conditions and replace or repair if necessary.

When the opening command is given, the motor starts but 

the leaf fails to move.

Check that the unlocking system is closed (see Pic.8).
Make sure that the electronic device for electric power adjustment is in good condition.
If the piston remains at the complete end of its stroke when the gate is closed, review the 

assembly procedure.

The operator jerks during movement.

The power of the gear motor may be insufficient for the characteristics of the gate’s wing; 

check the choice of model whenever required.
The operator’s front and rear attachments bend or are not fastened correctly. Repair or 

replace.

Содержание LOOK

Страница 1: ... Operating instructions move as you like www deasystem com ...

Страница 2: ... in explosive atmospheres or surroundings that may prove corrosive and damage parts of the product WARNING To ensure an appropriate level of electrical safet y always keep the 230V power supply cables apart minimum 4mm in the open or 1 mm through insulation from low voltage cables motors power supply controls electric locks aerial and auxiliary circuits power supply and fasten the latter with appr...

Страница 3: ...oduct is important to Verify that the gate complies with the legal requirements and then define the complete project of the installation Verify that the gate is well balanced and that it has no points of friction in opening and closing Identify an area that allows a smooth and safe manual operation of the operator Verify that the operator bulk Pic 2 is compatible with the area chosen for the fitti...

Страница 4: ...erators minimum H05RN F type coming directly from the control pa nel without any connection and shunt box and supplied by the installer Pic 15 Connection for 24V and 230V with limit switches For the operator power supply connection follow the instruc tions of the basic version Open a second hole in the plastic cover and apply the second provided cable clamp a reduced M16 Use a 3x0 75mm cable not s...

Страница 5: ...the parts indicated by DEA System and scrupulously follow all assembly instructions 6 2 Unlocking and Manual operation In the event of malfunctions or simple power failure release the motor Pic 8 and perform the operation manually The knowledge of the unlocking operation is very important because in times of emergency the lack of timeliness in acting on such a device can be dangerous WARNING The e...

Страница 6: ...es connected Follow the instructions in reverse to that described in the section Installa tion 3 Remove the electronic components 4 Sorting and disposing of the materials exactly as per the regulations in the country of sale WARNING In line with EU Directive 2002 96 EC for waste electrical and electronic equipment WEEE this electrical product must not be disposed of as unsorted municipal waste Ple...

Страница 7: ...esign of the automatism Pos Description 1 2 3 4 5 6 7 8 9 Anti lock picking key switch KYO Remote control Safety edge Radio keypad DIGlrad 104 Lux photocells Electric lock 1Pilly 60 column LOOK Lumy flashing light 0 T 7 E E 1 11 o x C e 4y O v 2x0 5mm2 f H 2x0 5 mm2 1111 4 x 0 5 mm _____ III 2 x 0 5 mm __ ___ _______ It _f i 1_ V 111 B 111 ILL r 1 P 4x1 mm2 230V o 3x1 5 mm2 24V 6 x 0 5 mm2 1 __L L...

Страница 8: ...4 1 1 2 2 2 2 500 mm 250 mm 200 mm ...

Страница 9: ... subjected to intense use or to move heavy gates it is recommended to weld the rear bracket as shown in picture A so to ensure a longer product lifa Fig A 4m C D mm 1100 1100 1500 1500 1500 1500 E mm 90 80 100 100 100 70 LOOK WARNING Non self locking models with same leaf length reduce gate weight by 30 from number seen in Length weight chart WARNING If the leaf is more than 2m long an electric lo...

Страница 10: ...D A C A Closing cycle Closing cycle Opening cycle Opening cycle ...

Страница 11: ...41 ...

Страница 12: ...42 APRE CHIUDE APRE CHIUDE COMUNE 4x1 mm 3x1 5 mm 24V 230V ...

Страница 13: ...29340 Rod cover stroke 320 520 mm CS520 629341 MAC LOOK P 629320 Extension for MAC and LOOK rams LOOK SB 629380 Adapter kit for doors in slope Max gradient 8 COL 515 629250 Anti falling stainless steel cable with 2 holes for swing doors ...

Страница 14: ......

Отзывы: