ddtop ULG Скачать руководство пользователя страница 7

     

 

  7 / 16 

 

WWW.DDTOP.COM 

2.3

包装

 

2.3 Packing 

请将包装废物送到专门的回收机构。 
  Please send the packaging waste to a special recycling agency. 

2.4

吊装运输时

 

2.4 Hoisting and Transporting 

请选用质量合格的吊装设备及吊装绑带,并注意安全。 
Please select qualified hoisting equipment and lifting straps, and pay attention to safety. 

2.5

仓储

 

2.5 Warehousing 

贮存温度-20℃~40℃;贮存湿度≤20%  。 
Storage temperature -20℃~40℃; storage humidity≤20%. 

3

技术特性

 

3 Technical Characteristics 

3.1

主要性能

 

3.1 Main Performance 

3.1.1 产品执行标准:JB/T9243 玻璃管液位计。 
3.1.1 Product Performance Standards:JB/T9243 glass tube level gauge. 

3.2

主要参数

 

3.2 Main Parameters 

3.2.1 针阀自动关闭压力:≥0.3MPa; 
3.2.1 Needle valve automatically closes pressure:≥0.3MPa; 
3.2.2 伴热蒸汽夹套接头:  R1/2 或按用户要求; 
3.2.2 Heat-storing steam jacket joint:R1/2 or according to user requirements; 
3.2.3 连接法兰:HG/T20592-2009,HG/T20615-2009 或按用户要求; 
3.2.3  Connection  flange : HG/T20592-2009 , HG/T20615-2009  or  according  to  user 

requirements; 

4

外形尺寸示意图

-图 2 

4 Dimensional Schematic 

-Figure 2 

若订货时要求为特殊尺寸,以实际尺寸为准。 

Содержание ULG

Страница 1: ...1 16 WWW DDTOP COM ULG ULG S BI COLOR GLASS TUBE LEBEL GAUGE ULG Operation Manual ULG DT JS 1010 2018 A...

Страница 2: ...er may be destroyed Trademark Copyright and Restriction Instructions DDTOP Dandong Top Electronics Instrument Group Co Ltd Dandong Top Pump Co Ltd DDTOP are registered trademarks of the company The pe...

Страница 3: ...dong Top Electronics Instrument Group Co Ltd does not provide any express or implied warranty Quality ISO9001 Dandong Top Electronics Instrument Group Co Ltd has passed the ISO9001 quality system cert...

Страница 4: ...onal Schematic 7 5 9 5 Unpacking and Inspection 9 5 1 9 5 1 Unpacking Inspection Notice 9 5 2 11 5 2 Check Content 11 6 11 6 Installation 11 6 1 11 6 1 Installation Tool 11 6 2 11 6 2 Installation Tec...

Страница 5: ...able local national international standards codes and procedures Be sure to install the equipment in Intrinsically safe or non flammable site operating procedures 1 2 1 2 Process leaks can cause serio...

Страница 6: ...alve 2 2 Compression Body 3 3 Socket Head Cap Screws 4 4 Graphite Filler 5 5 Quartz Glass Tube 6 6 Ruler 2 2 2 2 Operating Principle According to the principle of the connector the level in the contai...

Страница 7: ...dity 20 3 3 Technical Characteristics 3 1 3 1 Main Performance 3 1 1 JB T9243 3 1 1 Product Performance Standards JB T9243 glass tube level gauge 3 2 3 2 Main Parameters 3 2 1 0 3MPa 3 2 1 Needle valv...

Страница 8: ...Schematic S1 Glass Tube Level Gauge 2 2 S2 Figure 2 2 Dimensional Schematic S2 Glass Tube Level Gauge 2 3 S4 Figure 2 3 Dimensional Schematic S4 Glass Tube Level Gauge 2 4 S5 Figure 2 4 Dimensional S...

Страница 9: ...9 16 WWW DDTOP COM 2 3 S4 Figure 2 3 S4 Glass Tube Level Gauge 2 4 S5 Figure 2 4 S5 Glass Tube Level Gauge 5 5 Unpacking and Inspection 5 1 5 1 Unpacking Inspection Notice 5 1 1 3...

Страница 10: ...1 Check whether the product nameplate Figure 3 is consistent with the supply list information 3 Figure Product Nameplate 5 1 2 5 1 2 According to the packing list check the quantity of each part and...

Страница 11: ...onnections 6 1 2 6 1 2 Level 6 2 6 2 Installation Technical Requirements 6 2 1 6 2 1 Before installing the level gauge it is necessary to measure whether the center distance of the flange on the conta...

Страница 12: ...12 16 WWW DDTOP COM 4 Figure 4 Debugging 7 1 1 4...

Страница 13: ...the medium to flow into the level gauge Valve 4 7 5 2 4 7 5 Fully open the upper and lower valves of the gauge Valve 2 Valve 4 8 8 Failure Analysis and Elimination Fault Phenomenon Reason Method of E...

Страница 14: ...es Valve 1 Valve 2 Valve 3 Valve 4 remove the drain plug and drain the residual medium See Figure 5 9 2 2 6 9 2 2 Remove the hexagon socket head cap screws diagonally See Figure 6 9 2 3 9 2 3 After re...

Страница 15: ...ll and the end face of the glass tube is basically the same as that of the shell 9 4 2 9 4 2 Insert graphite packing ring into both ends of quartz glass tube 9 4 3 9 4 3 Install the compression body a...

Страница 16: ...16 16 WWW DDTOP COM...

Отзывы: