
14 / 16
WWW.DDTOP.COM
temperatures, corrosive or toxic media, etc.
9.2
拆卸
9.2 Disassembly
9.2.1 关闭全部阀门(阀 1、阀 2、阀 3、阀 4),卸下排污丝堵,排污残余介质(见图 5);
9.2.1 Close all valves (Valve 1, Valve 2, Valve 3, Valve 4), remove the drain plug, and drain the
residual medium (See Figure 5);
9.2.2 对角线方向拆卸内六角螺钉(见图 6);
9.2.2 Remove the hexagon socket head cap screws diagonally (See Figure 6);
9.2.3 卸下螺钉后,依次取下压紧体、石墨填料、石英玻璃管;
9.2.3 After removing the screws, remove the pressing body, graphite packing, and quartz glass tube
in turn;
图 5 拆卸螺钉
Figure 5 Remove the Screws
Содержание ULG
Страница 12: ...12 16 WWW DDTOP COM 4 Figure 4 Debugging 7 1 1 4...
Страница 16: ...16 16 WWW DDTOP COM...