![DCS CPU-36 Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/dcs/cpu-36/cpu-36_installation-instructions-manual_517171016.webp)
14
CABINET PREPARATION
8-5/16"
24"
28"
1-19/32" To Center
Line of Gas Inlet
5/16"
Cabinet face for installation
with projecting control panel
Cabinet face for installation
with flush control panel
2-1/2"
Countertop level
Fig. 5
30"
26-1/2"
12" Min. to Combustibles
without Backguard
15/16"
12"
Wall Mount
Low Backguard
Base Cabinet
Wall Mount
Full Backguard
36” Min. to
Combustibles
36” Min. to
Combustibles
As defined in the “National Fuel Gas Code” (ANSI Z223.1, latest edition).
Base Cabinet
Fig. 6
A B
US
CA