![DCS 221712 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/dcs/221712/221712_installation-manual_517403014.webp)
INSTALLATION
12
2.
Snap the central baffle filter panel into the place so the both rails engage with side pins on both
sides of hood. Drive 2 screws (1 on each side ) through baffle filter panel hole to hood. See
Fig. 12.
3.
Snap four-side baffle trim to hood (4 pins engage each side trim). The baffle trims are supplied
separately (for IVS52 only). See Fig. 13.
4.
Install all baffle filters as per Use and Care Manual instructions.
Fixing screw location
Fig. 12
Fig. 13
Baffle filter panel
Baffle trim
Содержание 221712
Страница 1: ...THE PROFESSIONAL ISLAND VENT HOOD Installation Guide MODELS IVS40 IVS52 RDS 364GD...
Страница 2: ......
Страница 22: ...NOTES 20...
Страница 23: ...LA HOTTE VACUATION PROFESSIONNELLE ISLAND Guide d installation MOD LES IVS40 IVS52DS 364GL RDS 364GD...
Страница 44: ...REMARQUE 21...
Страница 45: ...REMARQUE 22...
Страница 46: ...REMARQUE 23...
Страница 47: ......