![DCS 221712 Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/dcs/221712/221712_installation-manual_517403012.webp)
10
INSTALLATION
3.
Assembly of the 10” Transition.
The transition supplied with the hood mounts to the top
of the hood, Figure 5.
a. Place the transition piece over the hood exhaust
and secure with 4 screws provided.
b. Duct tape connection between transition and
hood.
c. Remove tape holding damper.
4.
Check that the screws on bottom of chimney structure
are partially screwed into place; these will serve to hang
and fix the canopy.
5.
If already mounted in place remove all grease filters.
6.
Back out the hanging screws on the bottom of the
chimney structure to 1/4” gap.
Lift the canopy up to the chimney support .
Carefully align the canopy keyhole to the screws on the
chimney support.
Slide the hood to engage the keyhole slots. See Fig. 6.
7.
Tighten screws securely (from inside the canopy). Fix
canopy to structure with 4 screws from inside the
canopy. See Fig. 7.
8.
Make final angular adjustment to unit at ceiling if necessary, then finish installation adding two
fixing screws. See Fig. 8.
additional
fixing screw
Duct
Transition
Top
of
Hoo
d
Screw
FIG.5
FIG.6
FIG.7
FIG.8
Содержание 221712
Страница 1: ...THE PROFESSIONAL ISLAND VENT HOOD Installation Guide MODELS IVS40 IVS52 RDS 364GD...
Страница 2: ......
Страница 22: ...NOTES 20...
Страница 23: ...LA HOTTE VACUATION PROFESSIONNELLE ISLAND Guide d installation MOD LES IVS40 IVS52DS 364GL RDS 364GD...
Страница 44: ...REMARQUE 21...
Страница 45: ...REMARQUE 22...
Страница 46: ...REMARQUE 23...
Страница 47: ......