4.3 Inspection Log
Date:______________
4.3.1 Freestanding Horizontal Rail System
Page______of______
Sample Form. Copy page to start inspection log record book. Fill out using ball point pen.
Date of Inspection:
Application of Product:
Inspector:
Serial # if
Applicable
Paint &
Labels
Fasteners
(Secure &
Undamaged)
Corrosion & Details
Structural Damage &
Details
Sign Off
Equipment Identification (Type, Application, Usage & Storage Location)
Components
(Please write description below)
Corrective Action Taken
(if required)
* Winch inspection and documentation as per Winch Manual.(if applicable)
* Record Winch serial numbers and counter reading under "components" (if applicable)
Содержание FSHRS
Страница 1: ......
Страница 2: ......
Страница 12: ...10 FT 3 m Model 20216 20 FT 6 m Model 20215 SAFE WORKING AREA 6 FT 1 8 m 6 FT 1 8 m STEP 5 TOP VIEW...
Страница 18: ......
Страница 20: ......