3
600 450
3.0
METRES
MINIMUM
250
DIAM
425
PREPARING THE SITE FOR YOUR ROTARY CLOTHESLINE
Preparing the ground socket
1.
Make sure the selected installation position has a
minimum of 3 meters clearance on all sides from the
central location.
2.
Excavate a hole 250mm in diameter x 600mm deep.
3.
Back fill the hole with screenings (small crushed
rock) to 450mm from ground level.
This is necessary
to drain rain water that enters via the socket.
4.
Position the the ground socket inside the hole so
that it sits centrally and vertically.
The bottom end of
the ground socket will rest on the screenings while the
top of the ground socket should reach the ground level.
Adjust the depth of the screenings as needed.
5.
To retain the ground socket in the central position,
backfill with screenings to 425mm from ground level.
Ensure no rocks are inside the socket.
Positioning the main tube assembly
PIN
SLOT
6.
Position 3 stakes spaced at an
equal distance around the hole
approximately 1 meter out.
Insert
the stakes at at angle approximatly
300mm into the ground.
7.
Insert the main tube assembly
into the ground socket making
sure the pin is positioned into
one of the slots.
Secure by
engaging the locking ring.
(See Fig. 1 – 4)
SCREENINGS
1
3
4
2