After installation, the boiler must be filled first. This should be
done following the instructions below.
Open the cold water inlet tap
.
Open any tap (preferably the closest tap) connected to the hot
water outlet of the appliance. The air in the boiler will be
discharged from this tap.
Close the tap after the air has been discharged from the tap
and water has started to flow continuously.
Water leakage should be checked carefully.
The filling is done with the blue filling tap under the device.
This should be done following the instructions below.
Make sure the cold water inlet tap is open.
Open the filling tap until the water pressure gauge is between
1 and 1.5 bar.
When the filling is complete, close the filling tap.
Discharge air accumulated in the radiators.
•
Heating water pressure should be checked to make sure that
it is between 1 and 1.5 bar after discharging the air in the
radiators .
•
Check to ensure there is no water leakage.
5.2.1.1. Filling the Boiler
5.2.1.2. Filling the Heating System
5.2.2. The Electrical Connections
11
Содержание UKDAX-10EBM
Страница 1: ...1 ...
Страница 25: ...Press to exit the setup menu 6 4 6 Setting the Heating Mode 25 ...
Страница 30: ...Press to exit the setup menu The device can operate in 3 different modes 6 4 8 Setting the Operating Mode 30 ...
Страница 44: ...44 ...
Страница 46: ...46 ...