13
6.2. Control Buttons
Control of the device is done with buttons placed under the LCD Display.
6.3. Operation Of Device
First operation of the device must be absolutely done by authorized service.
Our company is not responsible from damages and accidents which can be
occured with intervention to device by unauthorized people.
Before operating the device, suitability of all connections of mechanics and
electrical must be controlled. Heating system must be completely filled and radiator
vent must be done. Our company is not responsible from damages and accidents
which can be occur because of wrong connection.
Follow following points for operation of device.
. Make sure that device water and radiator valves are open
. Open residual current device then fuse.
After all symbols on the LCD screen appear a few min, LCD screen will be as in
the following
Содержание Naviels
Страница 1: ...1...
Страница 5: ...4...
Страница 10: ...9 Electric Boiler Boiler and heating installation sample principle scheme...
Страница 34: ...33 Weekends SUN SAT Weekdays MON TUES WED THUR FRI Days can be chosen one by one...
Страница 42: ...41 7 ELECTRICAL DIAGRAM...