background image

INSTALLATION GUIDE DINA SERIES

4

PARTS

*Drawings are for reference only. Please refer to actual product for exact size, shape, color, and parts. 

*Dawn reserves the right to make revisions in the design of faucets without notice for improvement of product performance and quality.

Note: Faucet sold separately.

Countertop not included.

Actual product parts may look different.

MATERIALS & TOOLS 

BEFORE YOU BEGIN

INSTALLATION

• 

Check Product Condition

Before installation, please check the condition of the product and, if appropriate, its components. If there is any problem with 

the product and/or its components, please contact the store you purchased it from for a replacement. As soon as you have 

inspected your product, please return it to its original packaging until you are ready to install it.

• 

Handle with Care

To protect its finish and avoid damage before and after installation, please handle the product with care. For care and cleaning 

tips after installation, please refer to the Care and Cleaning Guide in this instruction guide.  

1. 

Install the Vanity

• 

Use a stud finder to locate and mark the wall studs. 

• 

Remove the drawer(s) from the vanity cabinet. Lift and place the vanity cabinet in position against the finished wall. Make 

sure the top is level and the supply valves clear any drawers and/or shelves in the cabinet.

• 

Drill pilot holes through the vanity back and the finished wall. For holes not inline with studs, push or hammer in wall anchors 

that are made for your wall surface.

• 

Secure the cabinet to the finished wall with screws.

IMPORTANT: Recommended for professional installers only. The installer maintains responsibility for installing the product safely.

Safety Glasses, Pencil, Level, Tape Measure, Stud Finder, Assorted Screwdrivers, Assorted Wrenches, 

 

Drill, Screw Gun, Caulking Gun, Hammer, Screws, Nail Anchors/Molly Screws

Отзывы: