daviteq WS433-BL Скачать руководство пользователя страница 11

Red:

 PWR+(12...48VDC)

Black: 

PWR-(OVDC)

Green:

 B

White:

 A

Recommend to use 24VDC power.

The signal cable from sensor should be protected by corrugated hose or the Φ16 plastic tube, keep the cable avoid

high temperature areas.

The bracket will be fixed on the wall or material with a flat surface with 02 x M4 screws (supplied by the customer);

Each cable includes wires which are marked labels according to types of connection. (user should not cut these

labels before installation to avoid confusing)

6.3 Installation location

Please install the device at a height of 2 meters or less.

ATTENTION:

DO NOT 

install the Wireless bridge or its antenna inside a completed metallic box or housing, because the RF

signal can not pass through the metallic wall. The housing is made from Non-metallic materials like plastic,

glass, wood, leather, concrete, cement…is acceptable.

Содержание WS433-BL

Страница 1: ...2019 WS433 BL is a range of Sub Ghz wireless bridges to replace the RS485 cable or network This wireless technology will save time labor cost cable cost as well LOS Distance is up to 6000m at baud ra...

Страница 2: ...e license ISM 433 92Mhz for others 868 915 920Mhz refer related datasheets Ready to comply ETSI EN 300 220 EN 303 204 Europe FCC CFR47 Part15 US ARIB STD T108 Japan Vietnam Type Approval Certification...

Страница 3: ...LED blink 1 time that means registering Slave on Mastersuccessfully Buzzer plays 2 peep sounds LED blink 2 times that this Wireless bridge Slave isalready registered 5 Operation Principle 5 1 Add RS48...

Страница 4: ...reset User factory reset reset frequency RF transmit power data rate Slave ID Modbus operating parameters compare time for data status If it takes more than 30 seconds the button will be deactivated W...

Страница 5: ...33 92 MHz RF transmit power 15 dBm RF data rate 50 kbps For example when we read WS433 BL Slave data from WS433 BL Master the LED on the Slave will change 5 3 LED of WS433 BL LED of WS433 BL will chan...

Страница 6: ...pare 5 4 Checking connection with Modbus Tool Default offline address The Wireless Bridge Master address is200 The Wireless Bridge Slave address is201 Other Modbus RTU devices have the address provide...

Страница 7: ...Step 1 Connect Antenna RS485 configuration cable and power supply the wireless bridge...

Страница 8: ...p file and run file application mb_master 1 1 Choose COM Port the Port which is USB cable plugged in Set the BaudRate 9600 Parity none Template File of WS433 BL Master https filerun daviteq com wl id...

Страница 9: ...for WS433 BL by importing the csv file Go to MENU FILE Import New select the template file Step 3 We change the modbus address in column Slave write in command 16 and read the value with command 3 Ex...

Страница 10: ...The mounting bracket is made from hard metallic material Following to these steps as the below picture Please wiring as shown below 6 Installation 6 1 Mounting bracket installation 6 2 IO Wiring...

Страница 11: ...stomer Each cable includes wires which are marked labels according to types of connection user should not cut these labels before installation to avoid confusing 6 3 Installation location Please insta...

Страница 12: ...aster No power supply the power cord is incorrectly connected The antenna is not fastened or connected Slave registered with another Master Reset Slave with push button or magnet Check the power conne...

Отзывы: