1. Remove the battery cover of the sensor;
2. Insert a type D battery into the sensor.
STEP 2: Add sensor to co-ordinator
After inserting the battery for the sensor, power on the co-ordinator and bring the co-ordinator closer to the sensor to add the sensor automatically.
STEP 3: Configure the sensor's operating parameters
Use Modbus tool to check added sensors and configure sensor operating parameters.
STEP 4: Check operation of the sensor
1. Use the Modbus tool to check the configurations;
2. Test the configuration settings on the sensor.
STEP 5: Sensor installation and operation
Install sensor on site
Please note the battery terminals for correct installation
0.2 Radar level meter configuration check list
PLEASE REFER TO THE MANUFACTURER'S INSTRUCTIONS CAREFULLY TO AVOID DAMAGING THE
DEVICE: