daviteq A420-FCL Скачать руководство пользователя страница 6

To  achieve  accurate  measurements,  an  appropriate  flow  rate  in  the  range  of  30  to  60  L/hr  is  required  to  reach
equilibrium between the electrochemical consumption and the diffusion of chlorine. A beaker with magnetic stirrer can
be  used  for  electrode  evaluation  or  polarization  in  a  lab  environment,  but  for  real  continuous  measurement
applications, a flow cell system is required. A diagram of a flow cell system for the A420-FCL electrode, a pH electrode,
and a flow regulator is shown in picture below.

Make  sure  the  stainless-steel  ring  on  the  A420-FCL  chlorine  electrode  is  completely  submersed  in  the  water
(above the stainless-steel counter electrode).
The  flow  regulator  and  90o  elbow  tubing  is  important  for  the  devices  to  maintain  a  constant  flow  rate.  An
unstable flow rate will lead to an inaccurate chlorine measurement.
The flow regulator can be installed at INLET side as well.
Avoid  bubbles  adhering  to  the  center  hole  of  membrane  cap.  Bubbles  in  other  areas  of  membrane  cap  are
acceptable.
Make sure to maintain a clear space of ~25mm (about 1”) between the tip of the sensor cap and the bottom of
the flow cell tube.

The  output  of  A420-FCL  is  linear  with  chlorine  concentration.  As  a  result,  a  2-point  calibration  determine  the  final
calculation equation. Usually, the zero and the half-scale points are recommended for calibrating A420-FCL.

For the zero point (1st point), it can be obtained in zero chlorine water during the conditioning processing. Generally,
the zero point of A420-FCL should be within the specification ranges provided in Tables 1 and 2. The zero point drift is
very  slow  and  negligible  in  most  cases.  If  the  zero  point  of  A420-FCL  is  not  within  the  specification  ranges,  please
change  the  internal  filled  gel,  clean  the  working  electrode  and  polarize  the  probe  in  the  zero-chlorine  water  again.
Please check the zero point every quarter or half a year at least for more precision.

For the half-scale point (2nd point), it is usually around the middle point of the measurement range and it is the most
important  point  for  the  accuracy  of  A420-FCL.  In  most  cases,  the  calibration  of  A420-FCL  is  actually  a  1-point
calibration  while  zero  point  drift  can  be  ignored.  Thus,  the  colorimetric  DPD  method  (colorimeter,  photometer  or
spectrophotometer)  is  strongly  recommended  to  standardize  the  exact  concentration  of  chlorine  at  this  point.  There
are primarily two types of DPD Reagents commercially available:

1.  DPD Free Chlorine Reagent (DPD Method #1) for measuring free chlorine.

3.3. Installation into a flow cell or similar system

NOTE:

4. 

Calibration

Содержание A420-FCL

Страница 1: ...User Guide For Free Chlorine Sensor with Analog output A420 FCL User Guide For Free Chlorine Sensor with Analog output A420 FCL ...

Страница 2: ...tration up to 50 ppm The bound membrane sensor cap provides good stability and durability for this product In addition our proprietary Internal Filled Gel IFG significantly reduces the electrode measurement s pH dependence In principle the chlorine electrode measures the total chlorine of the water sample via the measurement mechanism described below However free chlorine measurement is also feasib...

Страница 3: ...le 6m with BNC connector Rating IP68 Sensor Dimension D21 3 x 219 mm Sensor net weight 200 grams Warranty 1 year for probe membrane for 03 months The Chlorine Electrode is designed to operate with 9 24 VDC power Connecting the electrode to any power outside the normal range may result in electrode damage and void the warranty In addition to complying with the instructions included in this manual b...

Страница 4: ...aside Note Avoid damaging the Silver Halide Coating gray portion 4 Polish the working electrode WE surface see arrow with the polishing strip until it is shiny in appearance Polish the gold tip in one direction Do not over polish this should just take a few strokes on the polishing strip Avoid touching the silver halide coating Rinse the electrode with DI water after polishing 5 Fill the membrane ...

Страница 5: ...The electrode is now ready for polarization and conditioning steps Yellow Vin Black Vin Red 4 20mA Input Green Ground 0VDC 1 The standard cable length is 3 feet If another cable length is needed contact your supplier or manufacturer The maximum length should be no more than 30 feet to avoid signal loss 2 The output current of power source should be more than 100 mA 3 The A420 FCL output can be mea...

Страница 6: ...ration As a result a 2 point calibration determine the final calculation equation Usually the zero and the half scale points are recommended for calibrating A420 FCL For the zero point 1st point it can be obtained in zero chlorine water during the conditioning processing Generally the zero point of A420 FCL should be within the specification ranges provided in Tables 1 and 2 The zero point drift is ...

Страница 7: ...ro point of A420 FCL is not within specifications or there is no significant change in the measurement environment but the electrode reading is continuously increasing or decreasing not fluctuating within an hour re polarization is probably needed The root cause is that some interfering substances probably were brought to the working electrode again such as unsuccessfully polishing the surface of wor...

Страница 8: ...ane the membrane cap may need to be replaced Please make sure the electrode is not powered during assembly and then follow the instruction below for replacement 1 Unpack the membrane cap replacement kit and prepare the new membrane cap on a clean surface 2 Unscrew the old membrane cap and discard it 3 Rinse the new membrane cap with clean water then rinse it with 1 2 mL of the IFG 4 Follow the ins...

Страница 9: ... outside of membranecap especially at center pore 3 Air bubbles inside the membrane cap 1 Clean or change membrane cap 2 Shake the electrode to remove theair bubbles from the center pore 3 Shake electrode or inspect the cap for air bubbles Slope too low 1 Membrane cap fouled 2 IFG deterioration 3 Insufficient conditioning 4 Flow rate too low 5 Erroneous DPD standardization 1 Clean or change membra...

Страница 10: ... Hung Vuong Res An Lac Ward Binh Tan Dist Ho Chi Minh City Vietnam Tel 84 28 6268 2523 4 ext 122 Email info daviteq com www daviteq com Distributor in Australia and New Zealand Templogger Pty Ltd Tel 1800 LOGGER Email contact templogger net 8 Support contacts ...

Отзывы: