3 of 10
19605P-23 (07-20)
Linking
Before a belt station and a gateway can be connected, they must first be Linked. As a security
measure, the close-link feature requires devices to be in proximity of about 1 to 3 ft (0.3 to 0.9m)
in order to successfully link. This ensures that the units are not inadvertently linked with other
units on the premises.
Linking procedure:
1.
Ensure units are within 1 to 3 ft (0.3 to 0.9m) of each other.
2.
Ensure the U9110-BSW(EU) is not already connected (see Status Indication).
3.
Simultaneously (within 1-2 sec) press and release the PTT button on the U9110-BSW(EU)
and the gateway to link with.
4.
Amber LED’s will flash on both devices. A momentary red LED indicates a successful
close-link.
5.
Upon successful link the U9110-BSW(EU) will attempt to establish a connection with the
gateway.
6.
Upon successfully establishing connection the LED will flash green, a voice alert will be
heard (see Table 1), and user side-tone will be enabled (see Communication).
7.
Link and connection are now complete.
Each belt station is able to be linked to only one gateway at a time. A gateway can have up to
four belt stations linked/connected at one time.
Tip:
Once linked, the devices will not need to be linked again unless they are purged (see
Purging).
Status Indications
The power button has a multi-color LED in the center which serves as a status indication for the
belt station. Table 1 below lists these states.
Table 1: LED Status Indication
LED Color
Blink Rate
Status
Red
Solid
Initializing/power up
Red
Solid
Close-link successful
Red
Any
Low battery (approx. 1 hr remaining)
Orange
Slow
Idle/Disconnected
Orange
Fast
Link/Connection in progress
Orange
Solid
PTT asserted
Green
Slow
Connected
Содержание 40992G-20
Страница 2: ......